13. OBoat Hire - Prescribed Tidal Works Code

Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria                      Acceptable Solution                       Comments

Design, construction and safety – pontoons

                                             the standard mentioned in
                                             paragraph (a) or (b) – the relevant
                                             planning scheme standard, to the
                                             extent it is more stringent than
                                             the standard mentioned in
                                             paragraph (a) or (b).
 Performance Criteria                     Acceptable Solution                       Comments

 Design, construction and safety – revetments and seawalls

 19.1 Prescribed tidal works that are     (s 5(2) outcome)                          Not applicable.
 a revetment or seawall are designed
 and constructed in a way to ensure it    The design and construction of the
 is able to support its intended loads,   revetment or seawall is consistent
 having regard to its relevant loading    with the following standards:-            The proposal is not a retaining wall,
 matters and its intended design life.                                              revetment or seawall.
                                          a)   subject to paragraph (c), each of
                                               the      following      Australian
                                               Standards      to   the     extent
                                               requirements stated in the
                                               Standard apply to relevant
                                               loading matters for the design or
                                               construction of the revetment or
                                               seawall:-
                                               (i) AS/NZS 1170.0;
                                               (ii) AS/NZS 1170.1;
                                               (iii) AS/NZS 1170.2;
                                               (iv) AS1170.4
                                               (v) AS 4997;
                                          b) subject to paragraph (c), AS 4678
                                               to the extent requirements
                                               stated in the Standard apply to
                                               earth-retaining structures;
                                          c) if a relevant planning scheme
                                               standard is more stringent than
                                               the standard mentioned in
                                               paragraph (a) – the relevant
                                               planning scheme standard, to
                                               the extent it is more stringent
                                               than the standard mentioned in
                                               paragraph (a).
 19.2 Prescribed tidal work that is a     (s 5(2) outcome)                          Not applicable.
 revetment or seawall, is designed and
 constructed in a way to ensure it can    The design and construction of the
 withstand:-                              revetment or seawall is consistent
                                          with the following standards:-            The proposal is not a revetment or
 a) any tendency of overturning or                                                  seawall.
 sliding; and                             (a) subject to paragraph (d), a
                                              revetment or seawall is able to
 b) any other effects of waves or
                                              withstand the effect of waves, or
 changes in water levels on the
                                              a combination of waves and
 revetment or seawall.
                                              water levels, resulting from a
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.