Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

AU213016247.Information Request Response (MCU25-0118) · MCU25/0118

of 7

Text shows just the words. Original shows the document exactly as it was published.

Our ref: 376730




   13. Earthworks

           Limited engineering details have been provided regarding the extent of earthworks required.
           Provide a preliminary earthworks plan including cross sections and identify top of wall, bottom
           of wall.

Applicant Response
As outlined in the Engineering response prepared by Arcos provided at Appendix B, revised Civil Drawings
have been included in the appendix, providing preliminary earthworks plan (MCU-C-201) and earthworks
sections (MCU-C-210 series).


End of Information Request Response.


We look forward to continuing working with you on this development. In the meantime, if you have any
queries please contact Ben Heaton on (07) 5436 7835.

Yours sincerely,
for RPS AAP Consulting Pty Ltd




Ben Heaton
Technical Director - Planning
[email protected]
+61 7 5436 7888


Cc:                 Jess Knott & Emily Latham, Coast2Bay Housing Group




RPS Australia East Pty Ltd. Registered in Australia No. 44 140 292 762
rpsgroup.com                                                                                             Page 7

Used in these records

About this file

File size
890 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

AU213016247.Information Request Response (MCU25-0118).pdf · 890 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.