NOOSA COUNCIL IDAS Development Application Decision Notice                                                     4 of 9


       15.    The existing concrete driveway shall be the sole vehicle access for machinery and construction
              staff during the excavation and construction phases of the development. A rock rumble pad,
              shaker grid or similar structure shall be provided within the site adjacent to the vehicle entrance to
              minimise the amount of material attached to vehicles leaving the site.

       16.    The pathway and road pavement in Hastings Street adjacent to the entrance to the work site shall
              be swept clean at regular intervals. The works shall be undertaken under traffic control where
              applicable.

       17.    Excavation of the site and the construction of the proposed works shall not have any adverse
              affects on the stability of adjoining buildings and/or structures and/or services and/or lands. In this
              regard a Registered Professional Engineer Queensland shall supervise the excavation of the site
              and the construction of the new works to determine whether any additional measures are required
              to protect the stability of adjoining buildings and/or structures and/or services and/or lands.

       18.    The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers
              and the use of vibrating installation techniques for sheet piling and other construction vibrations
              caused by excavating, earthmoving or demolition machinery or other similar construction
              techniques) unless approved and supervised by a Certified Geotechnical Engineer. Under such
              circumstances the operator of such equipment shall at all times comply with the directions of the
              Geotechnical engineer and the reasonable and lawful directions of Council officers.

       19.    All parts of the works (including excavation, retaining structures, tie backs etc) are to be wholly
              contained within the subject site. Any subground structures (support anchors, tie backs etc) to be
              utilised near trees to be retained shall be located such that the affect on the trees is minimised.

       20.    Certification of the completed works must be provided to Council by the supervising engineer. The
              certification shall state that the completed works conform with all aspects of the design and that the
              completed works will not have any adverse affects on the stability of adjoining buildings and/or
              structures and/or services and/or lands.

       21.    The Traffic Management Plan described in Condition 23 of Compiled Decision Notice File No:
              2004/4078 dated 22 November 2007 shall be submitted to Council for approval prior to the pre
              start meeting.

       22.    The sign posting for the car parking spaces 1 and 2 shall be amended to reflect the time frames as
              described in Condition 24 of Compiled Decision Notice File No: 2004/4078 dated 22 November
              2007.

       23.    Suitable root barrier shall be installed where proposed trees are adjacent to paths, pavement etc in
              accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.

       24.    Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed
              into the adjoining existing external downstream stormwater structures generally as shown on
              drawing No. 06562C1A dated 13 July 2007 by TOD Noosa.

              The device shall be checked and cleaned on a regular basis and specifically after each rain event.

              The device shall remain in place during the civil works and construction phases of the
              development.

              The device shall be installed prior to the commencement of any works.

       25.    Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice
              of intention to commence works to arrange a “pre start” meeting regarding the civil works.

       26.    The principal contractor must have all the appropriate insurance and public liability documentation
              to carry out the works. The principal contractor is also responsible to ensure that any sub
              contractors also have the appropriate insurance and public liability documentation.

       27.    Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
              Council’s signed approved drawings and conditions by the applicant.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@1c0df732\@[email protected]

Used in these records

About this file

File size
35 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001571.001 [As Published].pdf · 35 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.