28. The Consulting Engineers for the project shall be currently Registered Professional Engineers of
Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
Council’s Construction Technical Officer or nominated staff.
29. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
30. Council standards shall apply to these works unless otherwise modified herein.
31. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council property,
road pavements or facilities (such as underground drainage, water supply, sewerage, footpaths,
kerbing, landscaping, street furniture etc.) are protected against any damage or interference
whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the commencement of the use or, alternatively,
the Applicant may request the Council to carry out the rectification work at the Applicant’s cost,
such cost being paid by the Applicant to the Council prior to the commencement of the use.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid prior to the commencement of the use.
32. The development of the site shall be carried out in such a manner as to prevent dust and/or sand
nuisance to residents and/or tenants in the vicinity of the development.
33. Construction work and other associated activities are permitted only during the hours of 7.00 am
and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
where extended hours are approved by the Manager-Land Development or his nominee.
34. All signage, including that for safety during construction shall be in accordance with the Manual of
Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
35. Safe pedestrian access on Hastings Street and the Beachfront shall be maintained at all times.
Should footpath / road closures be necessary to carry out construction works, Council’s
Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.
36. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines
can be issued if sediments from the site are found to enter or have the potential to enter Council’s
stormwater system or natural waterways. Although the sediment and erosion control measures
have been approved on drawing No. 06562C1A dated 13 July 2007 by TOD Noosa, Council’s
Manager – Land Development may request further controls to be installed should approved
measures be inefficient.
37. The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant traps
in accordance with the manufacturers specifications.
38. The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps on
a weekly basis and after each storm event.
The owners of the subject property shall enter into an ongoing maintenance contract with a
Registered Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on a
regular three monthly cycle and on a “On Call” basis in the case of an emergency.
The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be
included in the ongoing maintenance scheme for the completed development.
39. The works to become Council assets will not be accepted until the landscaping is completed.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@1c0df732\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001571.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 35 KB (small file)
- File type
No other editions are linked here.