Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2015-01-12 General Committee Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   12 January 2015




                                    Page 25 of 147

GENERAL COMMITTEE MEETING AGENDA                                                                         12 January 2015

                                                                                                     SDA-0914-014456

                   SARA reference: SDA-0914-014456
                   Applicant reference: 201002
                   Council reference: OPW14/0307

                   Attachment 1—Conditions to be imposed
                 (No. [Conditions                                                         «dC nition timing
                   Operational Works
                   7.2.13 Coastal protection—Pursuant to section 255D of the Sustainable Planning Act 2009, the
                   chief executive administering the Act nominates the Director-General of the Department of
                   Environment and Heritage Protection to be the assessing authority for the development to which
                   this development approval relates for the administration and enforcement of any matter relating to
                   the following condition(s):
                   1.       The development must be carried out generally in accordance      At all times
                            with the following plans:
                                e   ‘Demolition Plan’, prepared by International Marina
                                    Consultants Pty Ltd, drawing no. 4656-101, dated 28 May
                                   2014
                                e   ‘General Arrangement’, prepared by International Marina
                                    Consultants Pty Ltd, drawing no. 4565-102/A, dated
                                    10 October 2014
                                «   ‘Elevation’, prepared by International Marina Consultants
                                    Pty Ltd, drawing no. 4656-103/A, dated 16 October 2014.
                                e   ‘Pile Layout, Profile and Schedule’, prepared by
                                    International Marina Consultants Pty Ltd, drawing no.
                                   4656-104/A, dated 16 October 2014
                                e   ‘Pontoon Setout’, prepared by International Marina
                                    Consultants Pty Ltd, drawing no. 4656-105/A, dated
                                    16 October 2014
                                e   ‘1.2m Overall Width x 7.5m Long Gangway’, prepared by
                                    International Marina Consultants Pty Ltd, drawing no.
                                   4656-106, dated 30 May 2014
                                e   ‘Standard Pontoon Details’, prepared by International
                                    Marina Consultants Pty Ltd, drawing no. 4656-109, dated
                                    30 May 2014.

                   2.       During the construction phase of the works:                      For the duration of
                            (a)  install and maintain all measures, plant and equipment      the works the subject
                                    necessary to ensure compliance with these conditions;    of this approval
                            (b)  only use materials which are:
                                i;   clean and free of silt;
                               ii.   free from pests, chemicals and other contaminants
                                     as defined under section 11 of the Environmental
                                     Protection Act 1994; and
                              iii.   suitable for the purpose; and
                            (c)  promptly remove any material or debris which has been
                                 deposited within the coastal management district or tidal
                                 waters, other than in accordance with this approval.
                  3.        Erosion and sediment control measures are to be installed and    Prior to
                            maintained to prevent the release of sediment to tidal waters.   commencement of
                                                                                             the works and
                                                                                             maintained until
                                                                                             their completion

                   Department of State Development, Infrastructure and Planning                        Page 4

                                                                                                           Page 25 of 147
Log in to download the original file

2015-01-12 General Committee Agenda(PDF, 14MB).pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.