GENERAL COMMITTEE MEETING AGENDA 12 January 2015
Page 25 of 147
GENERAL COMMITTEE MEETING AGENDA 12 January 2015
SDA-0914-014456
SARA reference: SDA-0914-014456
Applicant reference: 201002
Council reference: OPW14/0307
Attachment 1—Conditions to be imposed
(No. [Conditions «dC nition timing
Operational Works
7.2.13 Coastal protection—Pursuant to section 255D of the Sustainable Planning Act 2009, the
chief executive administering the Act nominates the Director-General of the Department of
Environment and Heritage Protection to be the assessing authority for the development to which
this development approval relates for the administration and enforcement of any matter relating to
the following condition(s):
1. The development must be carried out generally in accordance At all times
with the following plans:
e ‘Demolition Plan’, prepared by International Marina
Consultants Pty Ltd, drawing no. 4656-101, dated 28 May
2014
e ‘General Arrangement’, prepared by International Marina
Consultants Pty Ltd, drawing no. 4565-102/A, dated
10 October 2014
« ‘Elevation’, prepared by International Marina Consultants
Pty Ltd, drawing no. 4656-103/A, dated 16 October 2014.
e ‘Pile Layout, Profile and Schedule’, prepared by
International Marina Consultants Pty Ltd, drawing no.
4656-104/A, dated 16 October 2014
e ‘Pontoon Setout’, prepared by International Marina
Consultants Pty Ltd, drawing no. 4656-105/A, dated
16 October 2014
e ‘1.2m Overall Width x 7.5m Long Gangway’, prepared by
International Marina Consultants Pty Ltd, drawing no.
4656-106, dated 30 May 2014
e ‘Standard Pontoon Details’, prepared by International
Marina Consultants Pty Ltd, drawing no. 4656-109, dated
30 May 2014.
2. During the construction phase of the works: For the duration of
(a) install and maintain all measures, plant and equipment the works the subject
necessary to ensure compliance with these conditions; of this approval
(b) only use materials which are:
i; clean and free of silt;
ii. free from pests, chemicals and other contaminants
as defined under section 11 of the Environmental
Protection Act 1994; and
iii. suitable for the purpose; and
(c) promptly remove any material or debris which has been
deposited within the coastal management district or tidal
waters, other than in accordance with this approval.
3. Erosion and sediment control measures are to be installed and Prior to
maintained to prevent the release of sediment to tidal waters. commencement of
the works and
maintained until
their completion
Department of State Development, Infrastructure and Planning Page 4
Page 25 of 147See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.