Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2015-01-12 General Committee Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   12 January 2015




                                    Page 26 of 147

GENERAL COMMITTEE MEETING AGENDA                                                                         12 January 2015

                                                                                                     SDA-0914-014456

                  ‘No. [Conditions                                                       | ontton timing
                  4.        Should the works become damaged as a result of erosion,          At all times
                            flooding or storm tide inundation, the registered landowner(s) of
                            the land to which the works are attached, shall be responsible for
                            the collection and removal of all debris, previously being a part of
                            the works, at their own expense.
                            No sand shall be permanently removed from the erosion prone      At all times
                            area, and any clean sand excavated from the site must be placed
                            on the beach, seaward of the work.

                            Any debris or waste material encountered whilst undertaking      Prior to the
                            demolition works must be suitably disposed of at the applicant's completion of works
                            cost.

                   7.       The development must be in accordance with the ‘Demolition       At all times
                            Plan’, prepared by International Marina Consultants Pty Ltd,
                            drawing no. 4656-101, dated 28 May 2014, in particular:
                                e   The demolition work must incorporate best practice
                                    measures for the protection of water quality objectives by
                                    minimising the disturbance to the bed or banks.

                            Note: The water quality objectives are those of the receiving
                            waters as listed in the Environmental Protection (Water) Policy
                            2009.

                   7.2.15 Maritime safety—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief
                   executive administering the Act nominates the Director-General of the Department of Transport and
                   Main Roads to be the assessing authority for the development to which this development approval
                   relates for the administration and enforcement of any matter relating to the following condition(s):
                            Provide written notice to:                                       When the
                                    Regional Harbour Master (Brisbane)                       development
                                    Maritime Operations Base                                 authorised under this
                                    MacArthur Avenue East                                    approval has started
                                    PINKENBA QLD 4008                                        and when it has
                            when the development authorised under this approval has          been completed.
                            started, and when it has been completed.
                            These notices must state this permit number, the location and
                            name of registered place and the condition number under which
                            the notice is being given.

                            “As Constructed” drawings must be provided to:                   Within two (2) weeks
                                    Regional Harbour Master (Brisbane)                       of the completion of
                                    Maritime Operations Base                                 the works
                                    MacArthur Avenue East
                                    PINKENBA QLD 4008
                   10.      The construction, operation or maintenance ofthe structure, and | at all times
                            any ship moored at this structure, must not impede the safe
                            navigation of other ships or restrict safe access to or from
                            neighbouring structures.

                   Department of State Development, Infrastructure and Planning                        Page 5

                                                                                                           Page 26 of 147
Log in to download the original file

2015-01-12 General Committee Agenda(PDF, 14MB).pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.