GENERAL COMMITTEE MEETING AGENDA 12 January 2015
Page 27 of 147
GENERAL COMMITTEE MEETING AGENDA 12 January 2015
SDA-0914-014456
No. [Conditions | Conditiontiming |
11. Any ship, dry berth or device (including Air Lifting Pontoons) At all times
berthed, moored or attached to the pontoon/structure must not
exceed the following sizes:
e 9x ‘hire boat’ (5.3mx2.4m)
e 1x ‘charter boat’ (10mx3.2m)
e 6x ‘jet ski’
e 2x ‘hire boat’ (4.1mx2.0m)
e 2x ‘pontoon boats’ (6.5mx2.5m)
12. The development must be carried out generally in accordance At all times
with the plan ‘General Arrangement’, prepared by International
Marina Consultants Pty Ltd, drawing no. 4656-102/A, and dated
10 October 2014. In particular:
The structure and any part thereof, or any vessel moored at the
structure, must not extend beyond the water allocation as
indicated on the plan ‘Plan of Lot 158 - Cancelling of Lot 158 on
$P233178 & Part of U.S.L, being part of the Noosa River’,
drawing no. SP146043, and dated 4 December 2013.
13. All structures associated with the development must be lit/marked | At all times
in accordance with the following specifications, such that they are
clearly visible to approaching ships and do not cause a risk to the
safe navigation of other ships:
e Any anchors deployed by barges during the construction
must be marked yellow buoys and fitted with flashing
yellow lights.
e Any freestanding piles must have retro-reflective tape
fitted.
e The structure must be adequately lit and lighting must be
positioned so that it does not cause a risk to the safe
navigation of other vessels.
e Lighting must be provided in accordance with Maritime
Safety Queensland's requirement and section 3 of
AS 4282-1997 ‘Control of the obtrusive effects of outdoor
lighting’.
14. Any debris or similar obstruction encountered while undertaking Prior to completion of
the work must be suitably disposed of at the applicant's cost. works
15. All piles and/or structures to be demolished, both above and Prior to the
below the waterline must be completely extracted / removed. completion of works
Department of State Development, Infrastructure and Planning Page 6
Page 27 of 147See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.