2015-01-12 General Committee Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   12 January 2015




                                    Page 27 of 147

GENERAL COMMITTEE MEETING AGENDA                                                                            12 January 2015

                                                                                                        SDA-0914-014456

                  No. [Conditions                                                            | Conditiontiming      |
                    11.      Any ship, dry berth or device (including Air Lifting Pontoons)     At all times
                             berthed, moored or attached to the pontoon/structure must not
                             exceed the following sizes:
                                 e   9x ‘hire boat’ (5.3mx2.4m)
                                 e   1x ‘charter boat’ (10mx3.2m)
                                 e   6x ‘jet ski’
                                 e   2x ‘hire boat’ (4.1mx2.0m)
                                 e   2x ‘pontoon boats’ (6.5mx2.5m)

                    12.      The development must be carried out generally in accordance        At all times
                             with the plan ‘General Arrangement’, prepared by International
                             Marina Consultants Pty Ltd, drawing no. 4656-102/A, and dated
                             10 October 2014. In particular:
                             The structure and any part thereof, or any vessel moored at the
                             structure, must not extend beyond the water allocation as
                             indicated on the plan ‘Plan of Lot 158 - Cancelling of Lot 158 on
                             $P233178 & Part of U.S.L, being part of the Noosa River’,
                             drawing no. SP146043, and dated 4 December 2013.

                    13.      All structures associated with the development must be lit/marked | At all times
                             in accordance with the following specifications, such that they are
                             clearly visible to approaching ships and do not cause a risk to the
                             safe navigation of other ships:
                                 e   Any anchors deployed by barges during the construction
                                     must be marked yellow buoys and fitted with flashing
                                     yellow lights.
                                 e   Any freestanding piles must have retro-reflective tape
                                     fitted.
                                 e   The structure must be adequately lit and lighting must be
                                     positioned so that it does not cause a risk to the safe
                                     navigation of other vessels.
                                 e   Lighting must be provided in accordance with Maritime
                                     Safety Queensland's requirement and section 3 of
                                     AS 4282-1997 ‘Control of the obtrusive effects of outdoor
                                     lighting’.

                    14.      Any debris or similar obstruction encountered while undertaking    Prior to completion of
                             the work must be suitably disposed of at the applicant's cost.     works

                    15.      All piles and/or structures to be demolished, both above and       Prior to the
                             below the waterline must be completely extracted / removed.        completion of works

                    Department of State Development, Infrastructure and Planning                           Page 6

                                                                                                              Page 27 of 147
Log in to download the original file

2015-01-12 General Committee Agenda(PDF, 14MB).pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.