Original source · versioned page text
2015-01-12 General Committee Agenda
The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 January 2015 RECOMMENDATION That Council note the report by the Development Planner to the General Committee Meeting dated 12 January 2015 regarding Application No. MCU14/0077 for a Development Permit for Industrial Business Type 1 – Warehouse & Retail Business Type 4 – Showroom (trade related showroom, plumbing supplies) and OPW14/0324 for Operational Works (Stormwater Drainage, Landscaping, Car Parking and Access Driveway) situated at 10/100 Rene Street, Noosaville and: A. Approve the application in accordance with the following conditions: MATERIAL CHANGE OF USE When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan, prepared by Date DD201 J Floor Plan, prepared by Cool Architecture 14 October 2014 DD301 J Roof Plan, prepared by Cool Architecture 14 October 2014 DD401 J Rene Street Streetscape North Elevation, 14 October 2014 prepared by Cool Architecture DD402 J Eastern Elevation & Western Elevation, 14 October 2014 prepared by Cool Architecture DD403 J South Elevation, prepared by Cool Architecture 14 October 2014 2864-1 B Cover Sheet, prepared by Construction 15 October 2014 Hydraulic 2864-OP2 C Stormwater Management Plan, prepared by 15 October 2014 Construction Hydraulic 2864-OP3 C Stormwater Quality & Quantity Details, prepared 15 October 2014 by Construction Hydraulic 2864-OP4 A Stormwater Quality Maintenance, prepared by 15 October 2014 Construction Hydraulic DD701 J Landscaping Plan, prepared by Cool 14 October 2014 Architecture DD702 J Landscaping Notes & Schedules, prepared by 14 October 2014 Cool Architecture Building Height 3. The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level. Performance Bond 4. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Page 54 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.