GENERAL COMMITTEE MEETING AGENDA 12 January 2015
OPERATIONAL WORKS
Prior to Commencement of Works
25. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244.
The pre-start meeting must include the relevant parties for the following aspects of
the works:
a. Civil engineering works;
b. Erosion and sediment control works
26. A Construction Management Plan must be submitted to Council prior to the pre-start
meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
(i) A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and
traffic control measures prior to construction
(ii) Maintenance of safe pedestrian access across the frontage of the site
both during daily construction and after daily construction has ceased
(iii) Proposed fencing to the site during the construction phase of the
development
(iv) Adequate parking arrangements for construction workers
b. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures
c. Works program identifying key components of the works and their respective
durations
d. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of construction
times, impacts on traffic and services and other relevant issues
27. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
During Construction
28. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must
be repaired immediately on completion of the works associated with the
development. A condition report including photographs of the Rene Street frontage of
the site should be completed and submitted to Council at the prestart meeting.
29. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit. Where municipal
works are involved, such confirmation must be submitted for the respective hold
points prior to any site inspection by Council Officers.
30. All works must be constructed in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines
c. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
Page 57 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.