Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2015-01-12 General Committee Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                12 January 2015


         Service Vehicles
   17.   Service vehicle parking, manoeuvring and standing spaces must be provided on the
         site.
         Stormwater Drainage & Quality
   18.   The site must be provided with a stormwater drainage system connecting to a lawful
         point of discharge.
   19.   Any overflow from rainwater tanks installed on site must receive treatment within the
         bioretention basin prior to release from the site.
         Earthworks and Retaining Walls
   20.   All fill and associated batters must be contained entirely within the subject site unless
         written permission from the respective landowner(s) is provided to Council. All
         earthworks must be undertaken in accordance with the provisions of Australian
         Standard AS3798: Guidelines on Earthworks for Commercial and Residential
         Developments.
   21.   Where the development involves excavation or filling over, or adjacent to, drainage,
         water supply or sewerage infrastructure, all access chamber surface levels must be
         adjusted to provide a freeboard of 100mm above the finished ground surface level.
         Damage to Services and Assets
   22.   Any damage caused to existing services and assets as a result of the development
         works must be repaired at no cost to the asset owner at the following times:
         a.   where the damage would cause a hazard to pedestrian or vehicle safety,
              immediately; or
         b.   where otherwise, upon completion of the works associated with the
              development.
         Any repair work which proposes to alter the alignment or level of existing services
         and assets must first be referred to the relevant service authority for approval.
         Signage
   23.   All advertising signage must comply with the Advertising Devices Code.
         Waste Management
   24.   Refuse storage, removal and collection facilities must be provided in accordance with
         the following:
         a.    provision of separate bins (240l wheelie bins or 1.1 m3 bulk bins) for general
               and recyclable waste for the site
         b.    collection by service vehicles from the kerbside of the internal common property
               road frontage
         c.    provision of a hardstand impervious area within the site for the permanent
               storage location of the bins, having minimum dimensions of 0.36 m2 (600mm x
               600mm) per bin
         d.    provision of a 1.5m high purpose built enclosure to the storage location which is
               screened from the street
         e.    provision of a wash-down area in the vicinity of the permanent storage location
               fitted with a hose-cock and a drain connected to the sewer that has a
               stormwater catchment area of no more than 1m².




                                                                                 Page 56 of 147
Log in to download the original file

2015-01-12 General Committee Agenda(PDF, 14MB).pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.