Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2015-01-12 General Committee Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                12 January 2015


         Erosion and Sediment Control
   41.   Erosion and sediment control measures must be installed and maintained to minimise
         erosion on the site and to minimise the export of sediment and associated pollutants
         from the site. The erosion and sediment control measures must be designed,
         installed and maintained in accordance with current best practice standards.* Any
         waters discharged from the site in a 43mm rainfall event or less must contain less
         than 50mg Total Suspended Solids per Litre. (*refer to advisory notes)
   42.   Prescribed Water Contaminants (as defined in the Environmental Protection Act
         1994) must not be released from the site or to waters within the site, or be likely to be
         released should rainfall occur, unless all reasonable and practicable measures as
         detailed within the International Erosion Control Association Best Practice Erosion
         and Sediment Control Document (2008) are taken to prevent or minimise the release
         and concentration of contamination.
   43.   Prior to the the issue of the Certificate of Classification, all site surfaces must be
         effectively stabilised using methods which have achieved effective short-term
         stabilisation and which will continue to achieve effective stabilisation in the medium to
         long-term (refer to advisory notes). For the purpose of this condition, an effectively
         stabilised surface is defined as one that does not, or is not likely to result in visible
         evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or
         lead to water contamination.
   44.   Any exposed areas must be effectively stabilised without delay and prior to rainfall
         occurring.
         Works Within Road Reserve/Reinstatement
   45.   Safe pedestrian access on all streets in the vicinity of the development must be
         maintained at all times. Should footpath/road closures be necessary to carry out
         construction works, Council’s Engineering Officer must be notified prior to the
         proposed closure and all requirements complied with.
   46.   All frontage works must match neatly with existing road and verge/footpath features.
         Additional works beyond the frontage may be required to provide an acceptable
         transition to existing road and verge/footpath profiles. In this regard, any sections of
         the footpath in the common property frontage of the site that is either damaged or
         missing must be replaced as part of these works.
         Site Access and Driveways
   47.   Any existing unnecessary or redundant property accesses must be removed, and the
         kerb, footpath and verge area reinstated to match the existing footpath and/or verge
         treatments. Grassed verge areas to be reinstated must be provided with 100 mm
         topsoil and grass seed or turf, and must be maintained by the developer until
         established.
   48.   The following must be complied with during the construction of the required
         crossover/driveway:
         a.    The driveway must be constructed so as not to concentrate stormwater runoff
               onto neighbouring properties or cause ponding of water within the road reserve
         Earthworks
   49.   The finished surface levels of the site must be graded and shaped to ensure that all
         surface runoff is directed to the proposed drainage system and not directed on to any
         adjoining property.




                                                                                 Page 59 of 147
Log in to download the original file

2015-01-12 General Committee Agenda(PDF, 14MB).pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.