GENERAL COMMITTEE MEETING AGENDA 12 January 2015
Erosion and Sediment Control
41. Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants
from the site. The erosion and sediment control measures must be designed,
installed and maintained in accordance with current best practice standards.* Any
waters discharged from the site in a 43mm rainfall event or less must contain less
than 50mg Total Suspended Solids per Litre. (*refer to advisory notes)
42. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely to be
released should rainfall occur, unless all reasonable and practicable measures as
detailed within the International Erosion Control Association Best Practice Erosion
and Sediment Control Document (2008) are taken to prevent or minimise the release
and concentration of contamination.
43. Prior to the the issue of the Certificate of Classification, all site surfaces must be
effectively stabilised using methods which have achieved effective short-term
stabilisation and which will continue to achieve effective stabilisation in the medium to
long-term (refer to advisory notes). For the purpose of this condition, an effectively
stabilised surface is defined as one that does not, or is not likely to result in visible
evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or
lead to water contamination.
44. Any exposed areas must be effectively stabilised without delay and prior to rainfall
occurring.
Works Within Road Reserve/Reinstatement
45. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
46. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable
transition to existing road and verge/footpath profiles. In this regard, any sections of
the footpath in the common property frontage of the site that is either damaged or
missing must be replaced as part of these works.
Site Access and Driveways
47. Any existing unnecessary or redundant property accesses must be removed, and the
kerb, footpath and verge area reinstated to match the existing footpath and/or verge
treatments. Grassed verge areas to be reinstated must be provided with 100 mm
topsoil and grass seed or turf, and must be maintained by the developer until
established.
48. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway must be constructed so as not to concentrate stormwater runoff
onto neighbouring properties or cause ponding of water within the road reserve
Earthworks
49. The finished surface levels of the site must be graded and shaped to ensure that all
surface runoff is directed to the proposed drainage system and not directed on to any
adjoining property.
Page 59 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.