Original source · versioned page text
2015-01-12 General Committee Agenda
The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 January 2015
50. All earthworks shall be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development. Certification
must be provided by an RPEQ and submitted to Council the issue of the Certificate of
Classification for the building.
Service Conduits under Existing Road Features
51. Electrical conduits or other services proposed to be installed under existing sealed
carriageways, concrete pathways or concrete/sealed driveways must be installed by
boring. Trenching is not permitted, unless specifically approved by Council.
Supervision/Certification
52. Upon completion of the work a certificate must be issued by an RPEQ certifying that
the works have been constructed in accordance with the Operational Works permit.
Landscaping
53. The finished level of all mulch in garden beds must be a minimum of 50mm below the
level of the adjacent top of pavement. All landscaping is to be constructed in
accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines.
54. All approved landscaping works must be maintained in good condition for the
duration of the approved use.
55. All landscape works must be constructed and work procedure undertaken in
accordance with:
a. The approved plan and conditions detailed in this Decision Notice.
b. All relevant council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
56. Landscape works must be supervised, constructed and certified by qualified
persons*. (* Refer to Advisory Note)
Advisory Notes
Qualified Person – Landscaping
1. For the purpose of supervising landscape works and preparing a landscape
certification, is considered to be a landscape architect, landscape designer or
horticulturist with a minimum of three years current experience in the field of
landscape design.
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance
with the requirements of the National Construction Code - Building Code of Australia
(Volume 1) as they relate to people with disabilities. Your attention is also directed to
the fact that in addition to the requirements of the National Construction Code as they
relate to people with disabilities, one or more of the following may impact on the
proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development
Assessment to arrange a Development Compliance Inspection.
Page 60 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.