Original source · versioned page text
2016-03-01 Infrastructure and Services Committee Agenda
The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 1 MARCH 2016
Page 27 of 81
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 1 MARCH 2016
adjoining landowners. developments will allow for pedestrian access to
these properties, by breaking down barriers such
as high fencing and _ providing — suitable
landscaping and lighting, with access to the
commercial uses near the frontage.
Activation of Rufous Lane is a vital element to | As mentioned above, it is agreed that the
the proposed Master Plan and will provide a | activation of the Laneway will provide a
significant contribution to pedestrian | significant contribution to pedestrian and open
environmental and the public open space | space outcomes. The intention is also to ensure
outcomes sought by the Master Plan, by | that Laneway is inviting, safe and well light. This
providing a safe and secure environmental for | should mean that the Laneway will be used often
future users of this important public open space | as thoroughfare to the parking and open space
area. areas, while gaining access some commercial
uses on land to the south.
Support developments that will enhance | It is agreed that the activation of the Laneway on
Peregian Beach, but are quite worried that some | the northern side should be revisited given that
of these seem to encroach on our land, which | this land has different land uses, being
could impact our family’s privacy, security and | residential and the Kindergarten. Consequently,
environmental quality. it is intended to provide activated frontages to
the southern side of the Laneway only, where
commercial development exists and_ visitor
accommodation is primarily intended.
The Stage 2 relocation of the functions of the | The location of the mew Peregian Beach
Community House to the old bowling club | Community House will mean that the new
house site is supported. building will front and be integrated with the
open space area. Additional amenities are also
to be incorporated into this building, which will
be centrally located in the Precinct. Further, the
location is well suited given the fall of the land
and will provide for parking in Stage 1, which
will then be integrated into the development of
the Community House as part of Stage 2.
The new Community House should be at least | It is intended under the Master Plan to provide
equal the current building footprint of about | the new Peregian Beach Community House
500m?. having a floor area of at least 400m?, being
generally equivalent in size to the existing
building.
The location for the proposed new community | It is agreed that the location of the new
house has more appeal and offers more | Community House is logical and will assist with
opportunity/links/quieter space for community | the activation of the open space area. In this
groups and activities. location there is also potential for the open
space fronting the Community House to become
an extension of this use.
staging OOSOSOSOSCSSOCCCCTCSY
Page 27 of 81See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.