INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 1 MARCH 2016
Page 28 of 81
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 1 MARCH 2016
It is requested that Stage 1 proceed as soon as | All of the parts of the Master Plan as listed are to
possible with works 1, 7, 10, 12, 13, 14, 16, 17 | proceed with Stage 1, which includes the Pocket
and 19, with the Pocket Park to proceed with | Park. Having regard to other submissions made,
one carpark. it is now intended to slightly change the design
of the Pocket Park to maintain parking spaces
including a disabled access space, and provide
some open space with more clearly defined
pathways.
It is requested that works 6 and 8 be put on hold | While it is desirable to provide additional
for consideration at the time of implementing | parking near the Laneway with Stage 1, the
Stage 2 and the 26 carparking spaces on the | provision of parking in the reserve area is more
Oval be expedited instead as part of Stage 1. complicated and timely to achieve. This is
because the land is in State ownership and is for
recreation purposes and is not road reserve.
Consequently, this cannot be achieved with
Stage 1 and is part of the reason why the 23 at
ground parking spaces are to be provided with
Stage 1 near the Tennis Club. Further, it is now
intended to provide more carparking spaces
near the Veggie Village in the reserve area, but
with Stage 2.
That the walking and cycling circuit (11) | The comment about providing the walking and
proposed for Stage 2 be moved to Stage 1. cycling circuit with Stage 1 is noted and will be
considered further, but the development of this
infrastructure is subject to budgetary constraints.
Rather than create a new carpark on the|It would be more desirable to undertake
footprint of the old Bowls Club building with | additional parking beside the Veggie Village;
Stage 1 do an extension of the Veggie Village | however for reasons given above this is
carpark and do the temporary
5 1 1 2 25 6 968 1928 116 33 92 carpark adjacent | problematic and it is more practical and cost
the Tennis Club lane in Stage 2. effective to provide additional parking near the
Tennis Club in Stage 1. This parking will
ultimately form parking for the Community
House.
Provision of good signage, particularly for | It is agreed that some signage is required so that
parking and the Rufous Lane pedestrian access | the general public is aware of the additional
to the Village. parking and other new facilities that are to be
provided.
The Master Plan should allow for both economy | It is agreed that there is a need to maintain the
and environment to co-exist and thrive well into | necessary balance between the environment,
the future and not just meet the immediate | providing infrastructure, community facilities,
needs of the area. while at the same time encouraging innovative
development, such as the Digital Hub. In this
case the Master Plan is considered to achieve
the necessary balance, particularly with some of
Page 28 of 81See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.