2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4. Lifecycle Management Plan
4.1 Assets
Council’s pathways and boardwalks plays a vital role in the services provided to connecting the
community across the Noosa Shire. There are a number of different asset types within the pathways
and boardwalks asset management plan, with various units of measurement.
These assets included in this AMP are summarised below:
o Pathways
o Boardwalks
o Stairs
4.2 Asset Valuation
The value of the pathways and boardwalks Assets, at the end of the financial year 2017/2018 for the
purposes of this AMP is summarised below.
Pathways and
Asset Values at 2017/18 boardwalks
Current replacement cost $67,411,419
Depreciable amount $14,949,687
Depreciated replacement cost $52,461,732
Annual depreciation expense $1,127,943
Table 1: Pathways and boardwalks Asset Valuation
4.3 Asset Condition
Levels of service and asset management decision making is directly linked to asset condition; this
determines what condition the asset should be in before an asset management intervention. The
intent of current and future Condition Assessments (CA) is to:
• Provide a robust and repeatable process for carrying out condition assessments on Council’s
pathways and boardwalks assets;
• Use condition assessments to develop programs for intervention with regards to further
inspection, monitoring, maintenance and renewals;
• Provide a basis for information for the modelling of condition data for likelihood of asset failure
for those assets not inspected.
A consistent condition ranking scale has been chosen by Council as the framework for measuring
pathways and boardwalks assets, based on the 1 to 5 ranking according to the International
Infrastructure Management Manual (IIMM). Any asset scoring 4 (fair) to 5 (poor) will be considered
and prioritised under an asset specific renewal program.
Condition assessments will be undertaken by internal staff and are planned to commence throughout
the 2020/21 financial year. The data collected will be utilised to create a renewal program. Condition
assessments are cyclic and are proposed to be staged across a 3-5year period based on the
hierarchy of the assets, to cover all of Council’s pathways and boardwalks to ensure the continued
development and priorities of the renewal programs.
Asset Management Plan: Pathways and Boardwalks Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.