2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnIn addition to the above condition assessments, Council staff undertake visual condition assessments for requests that have been reported for assets in poor condition. These assessments are undertaken on a “reactive” approach to determine if the request warrants the need for future renewals. The majority of asset classes within the pathways and boardwalks have not had a physical condition assessment undertaken on them. For the purpose of this AMP, the assets that have not had physical condition assessments, the condition has been assigned as an age-based condition which is determined on the remaining useful life of the asset and is referred to as the “modelled condition”. Ongoing development and prioritisation will ensure that all pathways and boardwalks assets are reconciled within the asset system and condition assessments are undertaken. When undertaking condition assessments, the asset attributes are updated prior to the next asset evaluation. The condition assessments will enable the development of renewal programs for the specific assets. In the development of the asset system and the inspection program, there is a number of pathway and boardwalk assets that have been discovered and are yet to be commissioned on Council’s financial asset register. These assets are currently being commissioned through the Asset Data Management project and are being prioritised against other asset data management activities within the project. There is approximately a further 20% of assets within the pathways and boardwalks asset class to be commissioned onto the asset financial register, totalling approximately 48 kilometres of pathway and boardwalks. In asset reporting an approach to componentisation of the assets to the specific asset class has been undertaken. This breakdown and componentisation of assets to this level is in accordance with the financial asset standards and enables more detailed condition information at the component level. These components are detailed below and reported consistently throughout the AMP: Pathways Boardwalks Stairs Figure 1 details the total number of assets by both physical condition and modelled conditions that have been commissioned on our financial asset register. Any pathways and boardwalks assets that have reached condition 5 will be included in the relevant renewal programs of the 10-year Capital Works Program. Pathways and boardwalks assets have a modelled condition based on their remaining life and does not reflect the physical condition of those assets. Undertaking physical condition assessments of the assets is programed to commence throughout the 2020/21 financial year. Physical condition knowledge will assist in developing a more realistic approach to developing renewal plans that are prioritised and planned. This information is utilised in prioritising the physical condition assessments. Asset Management Plan: Pathways and Boardwalks Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.