2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4.5 Asset Renewals The purpose of developing a renewal plan is to identify assets that need to be replaced to maintain the current level of service. Asset failure due to lack of renewal will affect the capacity to deliver future renewals of pathways and boardwalks and subsequently the service these assets provide to the Noosa Community. Pathways and boardwalks asset renewals are condition based. Condition assessments provide staff the ability to develop capital renewal programs. The ongoing asset management maturity relies heavily on the continued development of the condition assessments and subsequent implementation of maintenance and renewal plans. Renewal expenditure is work which does not increase the pathways and boardwalks design capacity but restores, rehabilitates, replaces or renews an existing asset to its original service capacity. Improved condition assessment data capture is currently being developed to include asset renewal considerations based on physical conditions and estimates of remaining useful life of assets to guide and improve renewal programs. Renewal plans are developed to maintain levels of service to ensure assets achieve their optimal useful life before they reach the asset condition range of 5. Staff continue to work through the various asset classes to develop renewal programs for the specific asset classes. As previously stated - In the absence of condition data, an age-based approach to identify when Council’s pathways and boardwalks will reach their useful life has been developed to determine an overall renewal plan. Priority is required across all the assets classes that have not had physical condition assessments to develop a suite of renewal programs. The graph below depicts the past and planned renewals by capital program including the next 10 years. There are major renewals planned for Boardwalks in 2024 and ongoing renewals across pathways across the span of the 10 years. It is expected that through ongoing and detailed physical condition assessments that more defined renewals will replace the traditional “bucket” allocations that are currently identified and replaced with asset specific renewal programs within the 10-year capital works program. As the pathways and boardwalks assets age, continued condition assessments are required to monitor the assets deterioration profiles and will produce the more defined renewal plans. The graph below enables Council to identify and plan for these significant renewal activities for the next 10 years. Figure 7: Pathways and boardwalks Asset Renewal Costs Asset Management Plan: Pathways and Boardwalks Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.