2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
7. Plan Improvement and Monitoring
7.1    Status of Asset Management Practices
Currently all Asset Management activities are managed within the Noosa Council Asset
Management Governance Framework and enabled through Technology One (T1) asset information
management system. The establishment of a pathways and boardwalks working group will enable
the improvement program to set priorities and targets that are aligned to Council.


7.2    Improvement Program
The following initiatives are recommended:

1.    Asset Inventory – Ensure that there is one single asset register/hierarchy that captures all
      pathway and boardwalk assets; at a level of the lowest or appropriate repairable unit. All other
      duplicated asset lists/registers should be eliminated. T1 is the Enterprise Asset Management
      repository. Prior to the revaluation, it is recommended a detailed asset register and data
      reconciliation project establishes a single point of truth for asset data within T1. There is
      approximately 49km of pathway and boardwalks that have been captured that still requires to
      be commissioned onto the financial asset register.
2.    Asset Responsibility – Infrastructure Services Director is responsible for the pathways and
      boardwalks. However the asset managers are various across pathways and boardwalk assets
      due to the different locations and the structures and materials of the pathway and boardwalk
      assets. A detailed Asset responsibility matrix is required and will be developed over coming
      months by the pathways and boardwalks working group and is expected to be completed by
      February 2021.
3.    Condition Assessments – Condition assessments have commenced and whilst there is good
      knowledge of the defects of these assets there is no condition ratings on these assets. A
      consistent inspection regime combined with consistent condition scoring will enable the
      development of renewal plans and programs.
4.    Renewal Plans - The establishment of renewal plans for all assets considered in this AMP is
      considered essential to achieving good asset management outcomes. Renewal plans are
      based on understanding the condition of Council’s assets and modelling to ensure that the
      intervention for renewal achieves the assets useful life. The establishment and review of these
      renewal plans will be a focus for the Pathways and Boardwalks Working Group to develop and
      implement into Council’s processes and procedures.
5.    Capital Planning – The development of upgrade programs will support maintaining the levels
      of service and expectations of the community. Further renewal and upgrade programs across
      all pathways and boardwalks is required. The commencement of condition assessments will
      enable the development of capital programs across all pathways and boardwalks. These
      programs combined with the Cycling and Walking Strategy will improve prioritisation and
      strategy around the delivery of capital works.
6.    Asset Systems – There is the initial implementation of operational work orders for planned,
      reactive work and inspections to date. There are a number of functions of the T1 system that
      would improve the operational and maintenance activities and further improve the asset
      management objectives of the organisation. These include:
          Planned maintenance work orders;
          Costings via work orders;
          Inspections and defects logged within T1;
          Asset performance reporting from T1;
          Crew management;
          Data capture – asset validation and updating.


Asset Management Plan: Pathways and Boardwalks                                                Page 24
Log in to download the original file

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.