Log in to see the plans as drawn7. Plan Improvement and Monitoring
7.1 Status of Asset Management Practices
Currently all Asset Management activities are managed within the Noosa Council Asset
Management Governance Framework and enabled through Technology One (T1) asset information
management system. The establishment of a pathways and boardwalks working group will enable
the improvement program to set priorities and targets that are aligned to Council.
7.2 Improvement Program
The following initiatives are recommended:
1. Asset Inventory – Ensure that there is one single asset register/hierarchy that captures all
pathway and boardwalk assets; at a level of the lowest or appropriate repairable unit. All other
duplicated asset lists/registers should be eliminated. T1 is the Enterprise Asset Management
repository. Prior to the revaluation, it is recommended a detailed asset register and data
reconciliation project establishes a single point of truth for asset data within T1. There is
approximately 49km of pathway and boardwalks that have been captured that still requires to
be commissioned onto the financial asset register.
2. Asset Responsibility – Infrastructure Services Director is responsible for the pathways and
boardwalks. However the asset managers are various across pathways and boardwalk assets
due to the different locations and the structures and materials of the pathway and boardwalk
assets. A detailed Asset responsibility matrix is required and will be developed over coming
months by the pathways and boardwalks working group and is expected to be completed by
February 2021.
3. Condition Assessments – Condition assessments have commenced and whilst there is good
knowledge of the defects of these assets there is no condition ratings on these assets. A
consistent inspection regime combined with consistent condition scoring will enable the
development of renewal plans and programs.
4. Renewal Plans - The establishment of renewal plans for all assets considered in this AMP is
considered essential to achieving good asset management outcomes. Renewal plans are
based on understanding the condition of Council’s assets and modelling to ensure that the
intervention for renewal achieves the assets useful life. The establishment and review of these
renewal plans will be a focus for the Pathways and Boardwalks Working Group to develop and
implement into Council’s processes and procedures.
5. Capital Planning – The development of upgrade programs will support maintaining the levels
of service and expectations of the community. Further renewal and upgrade programs across
all pathways and boardwalks is required. The commencement of condition assessments will
enable the development of capital programs across all pathways and boardwalks. These
programs combined with the Cycling and Walking Strategy will improve prioritisation and
strategy around the delivery of capital works.
6. Asset Systems – There is the initial implementation of operational work orders for planned,
reactive work and inspections to date. There are a number of functions of the T1 system that
would improve the operational and maintenance activities and further improve the asset
management objectives of the organisation. These include:
Planned maintenance work orders;
Costings via work orders;
Inspections and defects logged within T1;
Asset performance reporting from T1;
Crew management;
Data capture – asset validation and updating.
Asset Management Plan: Pathways and Boardwalks Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.