Ensure plant and equipment is in maintained in good working Nuisance Laws
order and conforms to industry standards. prescribed in
the
5 The guidelines proposed in AS 2436 will be followed. Environmental
5 Protection Act
1994 QLD
Local Council
Plan the work activity with the contractor involved, select the Laws
correct size plant and check silencing equipment being used Protection of
operations
(Noise Control)
Regulation
2008 NSW
- Possible pollution of
B 3 H 5 Implement waste management plans (e.g. construction Waste Site Manager / HSE
Waste D3
☒ Management -
surrounding areas
Waste deposited on 17 waste, controlled waste including asbestos, hazardous reduction &
Recycling Act & M9
site chemicals, lead) Regulation
- Increased cost of 5 All waste is to be disposed of by a licensed contractor. No 2011
disposal of excess burning off of waste is permitted. Environmental
waste Protection
- Negative public image
5 All packaging around materials delivered to site to be placed
(Waste Control)
- Infringement Notice into the collection bins provided. Regulation
and fines 5 All food scraps to be placed into the collection bins provided 2004 WA
5 Regular clean-up of work areas to control the amount of Protection of
waste from each level, lowered to a central collection skip to the
environment
be removed from site (for high rise sites).
operations
2 Recycle bins on-site where practical. (waste)
5 Disposal of waste to be undertaken by licenced contractors. regulation 2005
5 Waste Tracking Certificate (WTC) must be completed for all NSW
Environmental
Regulated/ Controlled/ Hazardous Waste and filed for a
Protection
minimum of five (5) years (Waste
Management)
Policy 2000 QLD
Environmental
protection
(industrial
waste resource)
regulation 2009
VIC
- Combination and/or
A 4 E 5 Monitor weather daily to identify potential storm or high Best practice D3 Site Manager / HSE
Stormwater /
☒ Sediment
sediment laden
stormwater leaves 23 inundation events, and prepare/upgrade site erosion and
sediment M9
the site sediment/erosion controls accordingly. control 2008
Control
- Extreme Rainfall 3 Install and maintain appropriate erosion and sediment Environmental
Event control measures. Protection act
5 Follow the methods proposed in the Soil Erosion and 1994 QLD
Sediment Control - Engineering Guidelines for QLD
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.