5 EWP operator’s certification (licence) will be sighted and the workplace
NSW & QLD &
HSO at Induction
copied (where there is a facility) at induction.
SA 2011
6 Operators will wear a full body harness connected to the Managing the Site Manager /
anchor point within the basket whilst in operation of a EWP risk of falls in Subcontractor
Boom Lift and to be licensed to operate where the boom the workplace
length is 11m or more. TAS & NT 2012
Plant VIC 1995
5 Safe approach distances will be determined by plant operators
and/or the Site Supervisor using the COP: Working Near
Exposed Live Parts and Electrical Safety Act 2002 (or the
relevant state legislation / codes of practice / Australian
Standards) prior to any work commencing near overhead
power lines.
5 No worker, equipment or EWP will be required to enter the
exclusion zone around power lines.
5 Prior to use operators are to obtain relevant working at
heights permits.
☒ Environmental Impacts
- Dust Emissions
B 3 H On site watering equipment to be available to dampen down Env. Protection D3 Site Manager / HSE
Air Quality 5
☒ - Complaints from
neighbours 17 work areas and trafficable areas. Act 1994
Env Protection M9
- Infringement Notices 5 Reduce speed limit for plant and site vehicles.
(Air) Policy
and fines Plant generating dust to be fitted with appropriate water or 2004 TAS
4
collection control. Protection of
5 Visually monitor dust and emissions generated weekly. the
environment
operations
(clean air)
Limit dust generating activities during windy or storm regulation 2010
5 NSW
conditions.
Env Protection
(Air) Policy
2008 QLD
- Short term noise and
B 3 H 5 Keep neighbours informed of any expected noisy events or Env Protection D3 Site Manager / HSE
Noise and
☒ Vibration
vibration from plant
activities on site 17 changes to schedule. (Noise) Policy
2008 QLD M9
- 2 Engage an electric tower crane.
Complaints from AS/NZ
neighbours 5 Operation of plant and deliveries to occur between 7.00am 2436:1981
- Work outside to 5.30pm Monday to Saturday, except where prior approval "Guide to Noise
approved site Control on
has been obtained (e.g. from local council).
operating hours Construction,
5 Plant and equipment on site will not exceed the adjusted Maintenance
noise level by +10dB. Periodic monitoring may be undertaken and Demolition
as required by Site Manager. sites.”
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.