                       -    Oxidation of ASS                         5   Complete Environmental EWMS for Acid sulphate Soils and           State Planning            Subcontractor
     Acid Sulphate
☐     Soils
                            results in acidic
                            releases to the on-
                                                                         Implement Acid Sulphate Soil Management Plan                         Policy (SP2/02)
                                                                                                                                              Guideline for
                            site stormwater and                                                                                               Planning and
                            canal                                                                                                             Managing
                       -    Discharge water from                                                                                              Development
                            dewatering treatment                                                                                              Involving Acid
                            plant does not meet                                                                                               Sulphate Soils
                            guideline parameters
                       -    pH of the
                            groundwater
                            decreases by more
                            than 0.3 of a unit
                            below the established
                            baseline values
                       -    Dissolved Fe and Al in
                            the groundwater
                            increases by more
                            than 110% of the
                            established baseline
                            values
                       -    Inadequate lime,
                            guard layer applied
                            under temporary
                            stockpiles on-sit
                       -    Inadequate
                            treatment of ASS
                            material off-site
                       -    Negative impact on
                            surrounding
                            environment.
                       -    Cost of remediation.
                                                     D   4    14     5   Excavation plant (e.g. excavators, backhoes, etc.) will not be        WH&S Act        C3    Site Manager
    Excavation         Collapse of trench
☒   and Trenching
                                                                         operated by persons who do not have the appropriate
                                                                                                                                          
                                                                                                                                                2011 Part 2
                                                                                                                                                WH&S Reg        H13
                       Persons falling                                  authority.
                                                                                                                                                2011 Part 6
                                                                     1   Unsafe excavations will not be entered at any time by any              Div. 3                Site Manager
                       Objects falling
                                                                         person to perform work or otherwise.                                  Excavation
                       Confined spaces                              4   Materials will not be placed, stacked or moved near the edge           Work COP
                                                                                                                                                                      Subcontractor/ HSO
                                                                         of the excavation in such a way as to cause a collapse of the          2013
                       Contact with                                     work or endanger a person below.                                      Vic OHS Reg
                        underground                                                                                                             2007 Part
                                                                     3   Any excavations 1m deep or more are barricaded (barricades             3.6                   Subcontractor/ HSO
                        services
                                                                         at least 900mm high) to exclude entry or protect unattended           Vic OHS Reg
                       Undermining other                                excavations.                                                           2007
                                                                                                                                                Chapter 5 –
                        structures                                   3   Excavation areas will be barricaded as required.                                             Subcontractor/ HSO
                                                                                                                                                Div. 4 Part
                       Build-up of exhaust                          4   For trenches >1.5m deep where access is via ladders, ladders           5.1.26 – 27
                                                                                                                                                                      Subcontractor/ HSO
                                                                         are:                                                                  Managing
                        fumes etc.                                                                                                              the risk of
                                                                         - placed at 9m intervals in the part of the trench where a             plant in the
                                                                              person will be;
                                                             WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                                      Page 30

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.