- Oxidation of ASS 5 Complete Environmental EWMS for Acid sulphate Soils and State Planning Subcontractor
Acid Sulphate
☐ Soils
results in acidic
releases to the on-
Implement Acid Sulphate Soil Management Plan Policy (SP2/02)
Guideline for
site stormwater and Planning and
canal Managing
- Discharge water from Development
dewatering treatment Involving Acid
plant does not meet Sulphate Soils
guideline parameters
- pH of the
groundwater
decreases by more
than 0.3 of a unit
below the established
baseline values
- Dissolved Fe and Al in
the groundwater
increases by more
than 110% of the
established baseline
values
- Inadequate lime,
guard layer applied
under temporary
stockpiles on-sit
- Inadequate
treatment of ASS
material off-site
- Negative impact on
surrounding
environment.
- Cost of remediation.
D 4 14 5 Excavation plant (e.g. excavators, backhoes, etc.) will not be WH&S Act C3 Site Manager
Excavation Collapse of trench
☒ and Trenching
operated by persons who do not have the appropriate
2011 Part 2
WH&S Reg H13
Persons falling authority.
2011 Part 6
1 Unsafe excavations will not be entered at any time by any Div. 3 Site Manager
Objects falling
person to perform work or otherwise. Excavation
Confined spaces 4 Materials will not be placed, stacked or moved near the edge Work COP
Subcontractor/ HSO
of the excavation in such a way as to cause a collapse of the 2013
Contact with work or endanger a person below. Vic OHS Reg
underground 2007 Part
3 Any excavations 1m deep or more are barricaded (barricades 3.6 Subcontractor/ HSO
services
at least 900mm high) to exclude entry or protect unattended Vic OHS Reg
Undermining other excavations. 2007
Chapter 5 –
structures 3 Excavation areas will be barricaded as required. Subcontractor/ HSO
Div. 4 Part
Build-up of exhaust 4 For trenches >1.5m deep where access is via ladders, ladders 5.1.26 – 27
Subcontractor/ HSO
are: Managing
fumes etc. the risk of
- placed at 9m intervals in the part of the trench where a plant in the
person will be;
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.