Use of excavation - secured at the top and bottom against displacement; workplace
2013 QLD
equipment. - placed so the stiles of the ladder extend 1m beyond the
Mobile crane
landing place; COP 2006
- placed so that there is a safe place to stand when leaving QLD
the ladder; and Excavation
- Not made of metal or with wire reinforcing where there’s COP 2014
a risk of contact with electricity. NSW
Managing
4 Shoring will be provided where there is a reasonable likelihood the risks of Subcontractor / HSO
of a fall or dislodgement of earth, rock or other material from plant in the
a height of >1.5m that could harm a person. An adequate workplace
supply of shoring equipment will be provided and used. 2014 NSW
4 Caissons and cofferdams will be of sound construction and Plant COP
Subcontractor
VIC 1995
secured into position to prevent movement. Excavation
4 All trenches over 1.5m deep will have at least one or a COP WA Subcontractor / HSO
combination of the following controls to address each side of 2005
the trench: Safety
guarding of
- Shoring (with commercially manufactured sheeting which
plant and
has been designed by and engineer for its specific use and machinery
erected in accordance with the manufacturer / supplier’s WA 2009
instructions or sheeting / timber where a competent person Excavation
has inspected the trench and shoring and approved the use Work COP
TAS & SA
of the timber / sheeting), 2012
- Benching (benches no higher than they are wide unless a Managing
5 geo-technical engineer has approved a greater height in the risks of
writing). plant in the
workplace
- battering (not be more than 45 degrees from the horizontal
TAS & SA
unless a geo-technical engineer has approved the greater 2012
angle in writing), or
- geotechnical engineer’s certificate which approves in
writing all sides of the trench as safe from collapse, states in
writing how long the approval lasts if there is no stated
natural occurrence that could affect adversely the stability
of the trench and states in writing the natural occurrences
that could adversely affect the stability of the trench.
5 Where a trench is more than 1.5m deep and not shored, HSO /Site Manager
benched or battered and something happens that could affect
the stability of the trench or put someone at risk, work in the
trench will be stopped immediately and all persons will be
excluded from the trench. Work will not restart and persons
will not be permitted to enter the trench until a geo-technical
engineer inspects the trench and approves re-entry in writing
or all sides of the trench are shored, benched, battered or a
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.