Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 122, section 1. The text section number identifies this passage in the reader.
5 The first aid kit will be stocked appropriately for the number Site Manager / HSO
of workers onsite and the type of work being undertaken on a
weekly basis as per Hutchinson Builders Checklist HB-HSEQ-F-
028-A.
5 First aid signs will be displayed on the outside wall/door of a Site Manager / HSO
site shed or room containing a first aid kit. To be erected at
least 2 meters above the floor
5 All first aid equipment will be maintained in a hygienic, safe Site Manager / HSO
and serviceable condition.
5 Emergency contact names, numbers and address of the Site Manager / HSO
nearest medical centre (including a sketch-map of its location)
will be displayed onsite and form part of the workplace specific
induction.
In site Office
In lunch Room
In First Aid Room
The First Aid Officer will have his/her identity displayed at the
workplace and referred to during workplace specific
inductions.
5 All incidents on site will be reported to site management and Site Manager/ HSO
recorded on an Incident Report Form or Minor First Aid Form
depending on the treatment to be included in site specific
induction
4 Review the location and the type of work involved to Site Manager/ HSO
determine the requirement of a Sharps Kit to be made
available.
5 A minimum of one First Aid Officer will be available onsite at Site Manager/ HSO
all times.
5 A first aid kit will be maintained onsite and be able to be Site Manager/ First
transported throughout the workplace in an emergency. Aid Officer
5 A first aid room will be provided where it is assessed that the Site Manager
treatment for workplace injuries or illness would be more
effective with the provision of a first aid room, and in
alignment with the relevant state / territory regulations and
COP.
☐ QLD - construction sites >100 workers or as the project
requires
☐ NSW – construction sites >100 workers
☐ VIC - construction sites >100 workers
☐ SA – construction site with >150 workers
☐ ACT – Construction site with > 25 employees
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.