☐ Other:
A 4 E23 3 Where works to erect or dismantle formwork are undertaken, WHS Reg D4 Site Manager/
Formwork Collapse of
☒ formwork
the adjoining area will be closed to the public, or perimeter 2011
Chapter 6 H14 foreman
containment screening will be erected.
Vic OHS Reg
Falls from height 5 All tasks involving formwork will have an approved SWMS in 2007 Site Manager/
place. The SWMS will address all high risk activities including Chapter 5 foreman / Formwork
Falling objects Part 5.1
“work at heights” for tasks that are undertaken where a subcontractor
Slips and trips worker could fall 2m or more and address the following Vic
Compliance
hazards / issues (as applicable):
Noise - details of the method to be adopted to separate other
code:
Prevention
Dust trades and persons from the formwork zones of falls in
- collapse of formwork general
Manual tasks - falling objects
construction
Managing
- noise and dust the Risk of
- manual tasks Falls at the
- slips and trips Workplace
COP 2011
Access to the live working deck will be through one of the Site Manager /
QLD & NSW
following methods; & SA Structural Foreman
Extension Ladder – Tied top and bottom, at an angle Preventing
of 4:1 and protrude at east 1 metre above the landing Falls in
height. housing
construction
Hoist 2014 NSW
Internal Stairs Preventing
Mobile Scaffold Stairs falls at the
workplace
Perimeter Scaffold Stairs.
2004 WA
Formwork contractor will ensure that their work method Managing Site Manager /
complies with the QLD Formwork COP with work at the leading the risk of Structural Foreman
edge always being protected by at least 1.8 metres of false falls at
work (catch deck) in all directions. All timbers or proprietary workplaces
2012 TAS &
systems must be laid from below to remove work at height NT
risks. Preventing
5 falls in Site Manager/
Formwork that is a “basic formwork system” will be designed housing
construction
foreman / Formwork
by a formwork designer or professional engineer.
2012 TAS & subcontractor
NT
5 Site Manager/
Formwork that is not a “basic formwork system” will be Formwork
COP 2006 – foreman / Formwork
designed by a professional engineer.
QLD subcontractor
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.