3 Barricades will be erected to exclude unauthorised persons Site Manager / HSO
from the formwork area.
5 Warning signs will be erected to exclude unauthorised persons Site Manager / HSO
from the formwork area.
D 3 M9 5 A Hazardous Substances / Dangerous Goods Register will be WH&S Reg D2 HSO or Foreman
Hazardous Absorption or
☒ Substances contact with
maintained for the project, which includes: 2011 Parts 7
Sch 15 L5
and products a) a list of all hazardous substances and dangerous goods Vic OHS Reg
Dangerous used by any person on site, and the current SDS (i.e. dated 2007
Environmental within the last 5 years) for each substance; Chapter 4
Goods
contamination Managing
b) the quantity typically stored; the risks of
Fire c) the name of the relevant person, if any, that Hutchinson hazardous
substances
Builder’s knows is proposing to use the substance at the
Explosion in the
workplace; workplace
Compatible storage d) copies of any atmospheric monitoring and health 2013 QLD
surveillance undertaken on site in relation to hazardous Managing
the risks of
substances; and hazardous
e) A notation if no specific measures are necessary to control substances
the risks associated with exposure to the hazardous in the
workplace
substance. 2014 NSW
5 All tasks involving Hazardous Substances / Dangerous Goods Labelling of Subcontractor / HSO
will have an approved SWMS in place which addresses the hazardous or Foreman
chemicals
following issues / hazards (as applicable) 2011 NSW &
- fire and explosion QLD & SA
- absorption or contact with products Dangerous
- environmental contamination goods act
1985 VIC
5 The register and SDS’s to be used on site will be located in a Subcontractor / HSO
Labelling of
readily accessible position to any worker on site – filed at the hazardous or Foreman
project First Aid Room of Office where applicable. chemicals
5 SDS dated within the last five (5) years will be provided as part 2012 NT & Subcontractor / HSO
TAS
of SWMS and a copy kept with the product on site. or Foreman
Managing
5 Risk assessments for each substance (and its uses) will be the risks of Subcontractor / HSO
carried out prior to the hazardous substances / dangerous hazardous or Foreman
goods being brought/used onto site. substances
5 Personnel will be trained in the hazards associated with the in the
workplace Subcontractor / HSO
hazardous substances / dangerous goods, the risk assessment 2012 NT & or Foreman
and the correct use and maintenance of PPE. A signed training TAS
record will be kept (recorded on form HB-HSEQ-F-040-B).
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.