B 3 H13 5 The Hutchinson Builders Removal of Lead Materials Checklist WHS Reg Site manager /
Lead Removal Exposure to lead.
☐ will be completed prior to the removal of lead.
2011 Part
7.2 Subcontractor
Environmental
5 Controls will be implemented to prevent lead contamination VIC OHS Reg Site manager /
contamination. 2007 4.4
of the workplace and amenities. Subcontractor
5 Non-required persons will be excluded from lead removal Site manager /
areas. Subcontractor
5 Barriers and signage will be erected to delineate lead removal Site manager /
areas. Subcontractor
5 Atmospheric monitoring will be conducted where required by Site manager /
the lead risk assessment. Subcontractor
5 Site manager /
The lead removal area will be kept as clean as possible.
Subcontractor
5 Compressed air (or other compressed gas) or dry sweeping will Site manager /
not be used to clean the lead removal area. Subcontractor
5 No person is to eat, chew gum, smoke or carry anything used Site manager /
for smoking in the lead removal area. Subcontractor
5 Before moving from the lead removal area to any area used Site manager /
for eating and drinking workers will remove clothing and Subcontractor
equipment contaminated with lead and wash their forearms,
hands and face.
D 3 M9 4 Lighting will be provided on site sufficient and suitable for the WH&S Act D2 Site Manager /
Lighting Slips, trips and falls
☒ illumination of all common areas including stairways,
2011 Part 2
WH& Reg L5 Hutchinson Builders
Inability to see site corridors and passageways where persons must frequent,
2011
hazards pass or use. VIC OHS Act
4 Sufficient battery powered lighting (minimum 1 hour capacity) 2004 Site Manager /
will be installed in stairways, passageways and adjacent to AS/NZS Hutchinson Builders
switchboards to allow safe access to and aggress from the area 1680.1:2006
if there is insufficient natural “lighting” for the case of AS/NZS
1680.2:2008
emergency.
AS/NZS
4 Lighting levels will be in accordance with AS 1680, Parts 1 and 3012:2010 Hutchinson Builders
2. (Access: Min 40 LUX, Task Min 160 LUX) Electrical / Subcontractor
installations
4 Emergency lighting will be in accordance with AS/NZS 3012 -
requiring a minimum of 20 LUX for safe access and egress Construction
from the lift shaft. and
demolition
5 Subcontractors will be required to provide suitable and sites Subcontractor / HSO
sufficient task lighting for all work areas and workplaces
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.