requiring a greater luminance to perform their specific
activities in a safe manner.
5 Relocatable lighting will not be placed in a position where it Subcontractor / HSO
presents a trip hazard.
4 Wire guards or diffusers will be required to be provided to all Subcontractor / HSO
lighting to prevent damage.
C 3 H13 5 All loading bays installed to have an approved SWMS in place WH&S Reg D3 Site manager /
Loading Bays Loading Bay
☒ collapse for the safe installation, moving and removing to and from the
2011
Chapter 5, 6 M9
foreman
building structure and to be used in conjunction with the crane Subcontractor
VIC OHS Reg
Structural failure SWMS when manoeuvring the loading bay. 2007 Part Rigger
3.5
Falling Objects 5 • AS/NZS
Site Manager /
Scaffold loading bays are to be design into the scaffold design 1680.1:2006 foreman
drawings for the project and be verified by an engineer • AS/NZS Scaffold designer /
1680.2:2008
• AS/NZS engineer
5 The following evidence must be provided before the Loading 3012:2010 Manufacturer /
Electrical
Bays are to be used; engineer / Site
installations -
Manufacturer details on the safe installation procedure Construction and manager / foreman
and safe working procedure of the loading bay demolition sites Subcontractor /
Engineer design details of the loading bay to be used – Rigger
relating to the various reactions and loading capacity and
propped supports required
Project structural engineer’s approval as to where the
loading bays are to be positioned in the structure and to
the possible affect the operation of the loading bays may
have on the structure
5 Only persons with the appropriate licences who are familiar HSO at Induction /
with and competent in the installation of the type and size of Subcontractor
the loading bay to be installed will undertake tasks associated
with installation / removal / etc. of loading bays.
C 4 E18 2 Tower crane will be provided for use by workers and WHS Reg C3 Hutchinson Builder
Manual Manually handling
☒ Handling excessive loads
subcontractors. 2011 Part
4.1 H13
2 Hoist will be erected on site for use by workers and Hutchinson Builder
VIC OHS Reg
Adopting poor subcontractors. 2007 Part
postures when 5 Material storage areas will be specified on site. 3.1 Hutchinson Builder
undertaking manual Hazardous
5 Mechanical equipment will be maintained in a safe condition manual tasks Hutchinson Builders/
handling tasks
and records kept. Subcontractor
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.