2. Hydraulic Tower Crane – commissioning - servicing
every 250 hours of service.
3. Mobile Crane – 200 hours
4. Man & Material Hoist & Mash Climbers - monthly
inspection
5. Scissor Lifts & Boom Lifts - 3 monthly inspection
6. Earthmoving equipment require servicing every 250
hours of service
7. Piling Rig – 200 hours
8. Mobile Concrete Boom, line Pumps and Satellite
Boom – 200 hours
5/ A traffic movement and equipment placement plan will be Site Manager /
3 incorporated either into the site induction lay out plan or a Subcontractor
separate site plan lay out showing the following interaction;
separation of pedestrians to plant movements - where
possible
erection of plant speed limit, watch out for pedestrian signs
a and directional signs
Signed “Safe Walk Holding Areas” to allow plant to go pass
where persons and plant use the same travel and access
path
Identifying material unloading and loading storage area –
this may be one of the same area
Identifying subcontractor container storage areas
Mobile Crane and Concrete Boom Pump set – site team to
verify that the set up area to stable to support the activity
undertaken – Geotech Report to be reviewed
Identifying signage that deliveries are to report to the site
office
Owners of Plant requiring inspections to the relevant state Site Manager /
authority will provide evidence of completed inspection tests Subcontractor
to Hutchinson Builders upon request for;
Tower Cranes
Mobile Cranes
Mobile Concrete Boom Pump
Satellite Concrete Boom Pump
Piling Rig
5 The emergency procedures relating to plant will be displayed Subcontractor / HSO
in a manner that can be observed by persons who may be
exposed to risks from the operation of the plant.
Storage of plant not in use must be
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 54
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.