Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
34. Trade specific and site relevant inspections, Test Plans, SWMS’ and other necessary documentation
to satisfy requirements indicated in the specifications shall be submitted progressively as the works
proceed.
35. Preparation and maintenance of a conforming Quality System, ITP’s specific to the project. The
conforming Quality Procedure is to be prepared by the Subcontractor for the approval of HB and
any relevant consultants, prior to commencement of work.
Page 14 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.