Original PDF page 140, section 1. The text section number identifies this passage in the reader.

                                        C   5    E22    5   All tasks involving the installation of post tension equipment        WH&S Act        Site Manager or
    Post Tension    Concrete failure
☐   Slab
                                                            including pre-pour and post-pour of concrete will have an
                                                                                                                               
                                                                                                                                   2011 Part 2
                                                                                                                                   WH&S Reg
                                                                                                                                                   Foreman /
                    Cable failure                          approved SWMS in place. The SWMS will address at least the
                                                                                                                                   2008 Part 6     Subcontractor
                                                            hazards / issues identified in this document.                      
                    Collapse                                                                                                      NSW COP
                                                        5   Post Tension documentation will be designed and provided               Mono-strand     Site manager or
                                                            by a professional structural engineer prior to the work being          Post-           foreman / engineer
                                                            commenced on site.                                                     tensioning of
                                                                                                                                   Concrete
                                                        4   The formwork will be designed and erected to endure it                 Buildings       Site manager or
                                                            provides adequate support for the placement and movement              VIC OHS         foreman / engineer
                                                            of coils of strand and other equipment / materials required.           Regulation
                                                        5   Safe access will be provided to the working area with working          2007 Part
                                                                                                                                   5.1
                                                                                                                                                   Site manager or
                                                            platforms at the appropriate level and enough space for                                foreman / engineer
                                                            equipment and barricades.
                                                        5                                                                                          Site manager or
                                                            Prior to the placement of concrete the design engineer will
                                                                                                                                                   foreman /
                                                            verify the placement of conduits, cables and associated
                                                                                                                                                   subcontractor /
                                                            equipment meets the intended post tension design.
                                                                                                                                                   engineer
                                                        5                                                                                          Site manager or
                                                            Concrete MPA strength will be monitored and the design
                                                                                                                                                   foreman /
                                                            engineer will verify cable length extensions during the cable
                                                                                                                                                   subcontractor /
                                                            tensioning process.
                                                                                                                                                   engineer
                                                        5                                                                                          Site manager or
                                                            A copy of the current jack and gauge calibration certificate                           foreman /
                                                            will be kept with the jack and gauge on site at all times.                             subcontractor /
                                                                                                                                                   engineer
                                                        5   Prior to stripping any formwork the following will occur:                              Site manager or
                                                             Specification of the concrete strength required in                                   foreman /
                                                                conjunction with the final tensioning of cables.                                   subcontractor /
                                                             Back propping details, drawings and design by a                                      engineer
                                                                professional engineer is to be available on site and
                                                                provided to the formworker.
                                                             Consultation between the post tension contractor, design
                                                                engineer and site foreman to be undertaken to verify
                                                                that the formwork can be removed.
                                                             The site foreman to instruct the formworker to remove
                                                                falsework and back prop as required.
                                                        5   All grout tubes are filled and the rendering of cable heads will                       Site manager or
                                                            be completed by the subcontractor in a floor by floor                                  foreman /
                                                            sequence.                                                                              subcontractor


                                                WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                     Page 56

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.