C 5 E22 5 All tasks involving the installation of post tension equipment WH&S Act Site Manager or
Post Tension Concrete failure
☐ Slab
including pre-pour and post-pour of concrete will have an
2011 Part 2
WH&S Reg
Foreman /
Cable failure approved SWMS in place. The SWMS will address at least the
2008 Part 6 Subcontractor
hazards / issues identified in this document.
Collapse NSW COP
5 Post Tension documentation will be designed and provided Mono-strand Site manager or
by a professional structural engineer prior to the work being Post- foreman / engineer
commenced on site. tensioning of
Concrete
4 The formwork will be designed and erected to endure it Buildings Site manager or
provides adequate support for the placement and movement VIC OHS foreman / engineer
of coils of strand and other equipment / materials required. Regulation
5 Safe access will be provided to the working area with working 2007 Part
5.1
Site manager or
platforms at the appropriate level and enough space for foreman / engineer
equipment and barricades.
5 Site manager or
Prior to the placement of concrete the design engineer will
foreman /
verify the placement of conduits, cables and associated
subcontractor /
equipment meets the intended post tension design.
engineer
5 Site manager or
Concrete MPA strength will be monitored and the design
foreman /
engineer will verify cable length extensions during the cable
subcontractor /
tensioning process.
engineer
5 Site manager or
A copy of the current jack and gauge calibration certificate foreman /
will be kept with the jack and gauge on site at all times. subcontractor /
engineer
5 Prior to stripping any formwork the following will occur: Site manager or
Specification of the concrete strength required in foreman /
conjunction with the final tensioning of cables. subcontractor /
Back propping details, drawings and design by a engineer
professional engineer is to be available on site and
provided to the formworker.
Consultation between the post tension contractor, design
engineer and site foreman to be undertaken to verify
that the formwork can be removed.
The site foreman to instruct the formworker to remove
falsework and back prop as required.
5 All grout tubes are filled and the rendering of cable heads will Site manager or
be completed by the subcontractor in a floor by floor foreman /
sequence. subcontractor
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 56
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.