                                                                 Monthly inspections to ensure the erected scaffold is
                                                                  maintained to the as erected standard and that scaffold
                                                                  components have not been dislodge by work activities or
                                                                  environmental forces.
                                                         5   All Handover certificates will notate the design drawing and                               Site Manager /
                                                             the relevant Australian Standard to which they have been                                   Subcontractor
                                                             constructed.
                                                         4   Barricade exclusion zone will be erected to prevent vehicle                                HSO / Foreman
                                                             contact with erected scaffolding in areas where there is
                                                             vehicle traffic closer than 1.5 meters from the face of the
                                                             scaffold.


                                         D   3    M9     5   Designated storage areas will be identified and details                WH&S Act      D2   Site Manager /
    Slips, Trips    Poor housekeeping
☒   and Falls                                                communicated to subcontractors.
                                                                                                                                 
                                                                                                                                     2011 Part 2
                                                                                                                                     WH&S Reg      L5   Foreman
                    Uneven surface
                                                         4   Lighting on site sufficient and suitable for the illumination of        2011 Part 6        Site Manager /
                    Inappropriate                           all common areas including stairways, corridors and                    VIC OHS Act
                                                                                                                                                        Foreman
                                                                                                                                     2004 Part 3
                     footwear                                passageways where persons must frequent, pass or use will be
                                                             provided.
                    Inappropriate
                                                         5   Rubbish skips will be provided on site and removed and                                     Site Manager /
                     storage areas
                                                                replaced regularly.                                                                     Foreman
                                                         4   Sufficient battery powered lighting (minimum 1 hour capacity)                              Site Manager /
                                                             will be installed in stairways, passageways and adjacent to                                Foreman
                                                             switchboards to allow safe access to and aggress from the area
                                                             if there is insufficient natural “lighting” in the case of an
                                                             emergency.
                                                         4                                                                                              Site Manager /
                                                             Safe, well-drained access ways will be provided.
                                                                                                                                                        Foreman
                                                         5   Clear access will be maintained around site (walkways, access                              All personnel
                                                             ways, stairways and floor areas).
                                                         4   Subcontractors are required to provide suitable and sufficient                             Subcontractor
                                                             task lighting (min 200 Lux) for all work areas requiring a
                                                             greater luminance to perform their specific activities in a safe
                                                             manner.
                                                         5   Relocatable lighting will not to be placed in a position where it                          Subcontractor
                                                             presents a trip hazard.
                                                         6   Safety boots to be worn in all areas on site.                                              All personnel
                                                         5                                                                                              Site Manager /
                                                             Daily housekeeping reviews will be conducted by site team
                                                                                                                                                        Foreman / HSO
                                                             and record maintained using Site Inspection Form.

                                                 WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                         Page 63

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.