5 After erection / modification of any scaffold (excluding mobile Code:
Prevention
Subcontractor
scaffolds under 4m high), the subcontractor erecting /
of falls in
modifying the scaffold will provide a sign-off certificate. general
5 Scaffolds will be inspected: construction. Scaffolding
- before first use Subcontractor
- every 7 days a visual inspection will be completed
- immediately following any disturbance, incident or major
weather impact that might reasonably be expected to
affect the stability of the scaffold or supporting structure;
- following any repairs and modifications; and
- At intervals not exceeding thirty (30) days.
The following will be implemented to prevent unauthorised Site Manager /
access or injury from falling objects: Subcontractor
3 Exclusion zones will be established around the
scaffolding and adjoining areas
4 Perimeter containment screening / scaffold fans /
hoardings / gantries will be used
5 Scaffold will be erected / dismantled during quiet
5 times of the day
1 Signage / Tags will be posted to warn of hazards
Materials will not be dropped from any scaffold
5 Mesh used from perimeter screening will comply with the Site Manager /
requirements of the relevant legislation / COP / Australian Subcontractor
Standard.
5 If a scaffold is incomplete or unsafe, and left unattended, Site Manager /
controls including the use of danger tags, warning signs and no Subcontractor
access signs will be used to prevent unauthorised access onto
the scaffold.
5 Scaffolder’s certification (licence) is to be sighted and copied HSO at Induction
(where there is a facility) at induction.
5 Scaffolding tasks including design, erection, modification or Site Manager /
inspection will not be undertaken by persons who do not hold Subcontractor
the appropriate qualification / certification to do those tasks.
5 Scaffold will not be greater than 225mm gap from the building Site Manager /
or structure with decks not greater than 300mm above or Subcontractor
below the slab level.
5 Hutchinson Builders Scaffold Inspection Checklist will be Site Manager/
actioned by a site team member together with the licensed foreman/HSO
scaffolder as follows:
As part of the Handover Certificate on Erected or Altered
scaffolding
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.