C 5 E22 5 A review of the profile of the building will be completed, to WHS Act Site Manager or
☐ Suspended
Swing Stage
Falls from height
consider the use of alternative methods to carry out the works
2011
subdivision 6 Foreman /
Falling objects i.e.: Climbing Mast or Scaffolding. WH&S Reg Subcontractor
Swing Stage 5 Prior to placement, erection, use and dismantling of a swing 2011
Site Manager or
Chapter 5,6
Collapse stage on site Hutchinson Builders will complete the Foreman
VIC OHS Act
Hutchinson’s Suspended Swing Stage Safety Checklist. 2004 Part 3
5 For relocation of the swing-stage suspension system a VIC OHS Reg Installer / Supplier
verification statement will be completed and signed by the 2007 sch 3
installer and issued to Hutchinson Builders.
5 If the system is reinstalled and the reinstallation is different to Site Manager or
that which was originally verified by the engineer, the Principal Foreman
Contractor or Building Owner Swing-stage Statement and
associated processes and documentation will be completed.
5 A load test conducted in accordance with the Swing-stage Installer / Supplier
Load Test Procedure (WHSQ) will be undertaken for each
installation of a swing stage system.
5 The Safe Working Load (SWL) will be clearly marked on the Installer / Supplier
cradle of the suspended scaffold and the limit will not be
exceeded.
4 Materials will be evenly distributed, and not concentrated in Swing Stage User
one area.
5 Swing-stage operators will verify the mass of the load to be Swing Stage User
included in the cradle prior to use.
4 All electric scaffold hoists will have a device to limit the lifting Installer / Supplier
capacity of the hoist to a maximum of 1.25 times the rating of
the hoist.
5 Only an advanced rigger or advanced scaffolder (under the Advanced Rigger /
national certification system) who is competent in the Scaffolder
installation of swing stage systems is to install suspended
scaffolds.
5 Inspection and maintenance of the swing stage will be Installer / Supplier /
undertaken in accordance with the manufacturers / engineers Advanced Rigger /
/ competent persons recommendations and inspected at Scaffolder
least:
- before first use;
- prior to each days use;
- immediately following any disturbance or major weather
impact that might reasonably be expected to affect the
stability of the scaffold or supporting structure;
- following any repairs and modifications; and
- At intervals not exceeding thirty (30) days.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 65
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.