Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 150, section 1. The text section number identifies this passage in the reader.

                                                          5   Swing stage inspection and maintenance records will be                                      Site Manager or
                                                              obtained from the installer to ensure currency.                                             Foreman
                                                          5   Swing stage contractor/supplier will provide documentation                                  Site Manager or
                                                              (signed by a qualified engineer), to verify the swing stage                                 Foreman /
                                                              components meet the manufacturer’s specifications in                                        subcontractor /
                                                              addition to all other relevant documents / sign offs as                                     engineer
                                                              identified within the Principal Contractor or Building Owner
                                                              Swing-stage Statement.
                                                          5   Safety plan and SWMS on the safe set up, erection, servicing                                Site Manager or
                                                              and dismantling of the swing stage will be obtained from swing                              Foreman /
                                                              stage contractor/supplier.                                                                  contractor
                                                          5   Swing stage contractor/supplier will provide:                                               Site Manager or
                                                               Training of workers in the safe operation and retrieval                                   Foreman /
                                                                 procedures to use the swing stage – records kept.                                        contractor
                                                               Training of workers in the Daily Inspection Checklist
                                                                 required to be action and completed prior to using the
                                                                 swing stage – supplier to provide checklist and log book.
                                                               Training of workers to inspect the Rostrum set-up and
                                                                 enclosure prior to use of swing stage.
                                                          5   Hutchinson Builders will ensure that the site induction                                     Site Manager or
                                                              addresses the safe operation of the swing stage.                                            Foreman
                                                          6   Persons located in swing stage cradles will wear fall arrest                                Swing Stage User
                                                              harnesses attached to a properly designed anchorage system,
                                                              or where a fall is not possible, a travel restraint system
                                                              attached to a static line in the cradle will be used.
                                                          6   Swing stage users are to use tool restraints / lanyards to                                  Swing Stage User
                                                              prevent tools / equipment from falling from the swing stage.


                                          C   4    E18    5    Where construction activities require that vehicular traffic be       WH&S Reg       D3   Site Manager
☒   Traffic and
    Roadway
                   Vehicle/Vehicle
                    Collision
                                                               impeded, a Traffic Management Plan will be developed by a              2011
                                                                                                                                      Chapter 6      M9
                                                               competent person in accordance with the Manual of Uniform
    Management                                                                                                                       QLD Traffic
                   Vehicle/ Pedestrian                        Traffic Control Devices.                                               Managemen
                    Collision                             5   All tasks involving Traffic & Roadway Management will have              t for               Subcontractor /
                                                              an approved SWMS in place that takes into account at least              Construction
                                                                                                                                      or
                                                                                                                                                          Foreman / HSO
                                                              the following hazards / issues:
                                                                                                                                      Maintenance
                                                                   - vehicle / vehicle collision                                      Work COP
                                                                   - vehicle / pedestrian collision                                  Vic OHS Act
                                                          5   Where the altered roadway/path cannot be controlled                     2004 Part 3
                                                                                                                                                          Subcontractor /
                                                               through the use of safety barriers and signage alone, traffic                              Foreman / HSO
                                                               controllers will be provided to direct vehicles and pedestrians.
                                                  WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                            Page 66

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.