5 Swing stage inspection and maintenance records will be Site Manager or
obtained from the installer to ensure currency. Foreman
5 Swing stage contractor/supplier will provide documentation Site Manager or
(signed by a qualified engineer), to verify the swing stage Foreman /
components meet the manufacturer’s specifications in subcontractor /
addition to all other relevant documents / sign offs as engineer
identified within the Principal Contractor or Building Owner
Swing-stage Statement.
5 Safety plan and SWMS on the safe set up, erection, servicing Site Manager or
and dismantling of the swing stage will be obtained from swing Foreman /
stage contractor/supplier. contractor
5 Swing stage contractor/supplier will provide: Site Manager or
Training of workers in the safe operation and retrieval Foreman /
procedures to use the swing stage – records kept. contractor
Training of workers in the Daily Inspection Checklist
required to be action and completed prior to using the
swing stage – supplier to provide checklist and log book.
Training of workers to inspect the Rostrum set-up and
enclosure prior to use of swing stage.
5 Hutchinson Builders will ensure that the site induction Site Manager or
addresses the safe operation of the swing stage. Foreman
6 Persons located in swing stage cradles will wear fall arrest Swing Stage User
harnesses attached to a properly designed anchorage system,
or where a fall is not possible, a travel restraint system
attached to a static line in the cradle will be used.
6 Swing stage users are to use tool restraints / lanyards to Swing Stage User
prevent tools / equipment from falling from the swing stage.
C 4 E18 5 Where construction activities require that vehicular traffic be WH&S Reg D3 Site Manager
☒ Traffic and
Roadway
Vehicle/Vehicle
Collision
impeded, a Traffic Management Plan will be developed by a 2011
Chapter 6 M9
competent person in accordance with the Manual of Uniform
Management QLD Traffic
Vehicle/ Pedestrian Traffic Control Devices. Managemen
Collision 5 All tasks involving Traffic & Roadway Management will have t for Subcontractor /
an approved SWMS in place that takes into account at least Construction
or
Foreman / HSO
the following hazards / issues:
Maintenance
- vehicle / vehicle collision Work COP
- vehicle / pedestrian collision Vic OHS Act
5 Where the altered roadway/path cannot be controlled 2004 Part 3
Subcontractor /
through the use of safety barriers and signage alone, traffic Foreman / HSO
controllers will be provided to direct vehicles and pedestrians.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 66
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.