Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 156, section 1. The text section number identifies this passage in the reader.

             Application
                 - Fall arrest devices (external check only)
             Activity
                 - 3 monthly inspection by a competent person

             Application
                 - Belts, harnesses, lanyard assemblies and associated
                      personal equipment
             Activity
                 - 6 monthly inspection by a competent person

             Application
                  - Permanently installed anchorages
                  - Fall-arrest devices (full service including dismantling
                       where indicated).
                  - Horizontal lifelines and rail, including integral
                       components and permanently installed             mobile
                       attachment devices.
             Activity
                  - 12 monthly inspection/ service by competent person.
         5   Servicing schedules will be placed on the Hutchinson Builders       Site Foreman/
             Height Safety Gear Register (HB-HSEQ-F-038) prior to                subcontractor
             equipment being used on site. This register shows the service/
             maintenance duration and date of the last service for each
             item.
        3/   Where workers are required to access or work on any part of         Site Foreman/
        4    a roof of a building or structure which comprises of or includes    subcontractor
             brittle or fragile roofing material the following will be action;
             Existing or New Roof Sheeting:
             ☐ Assess and provide a suitable walkway to where workers
             need to work – planks or sheets of ply laid on roof material for
             access way and work area.
             ☐ Provide warning signage or exclusion zones outside of
             identified walkways and work areas
             Existing or New Roof Skylights:
           Where workers are required to work within 2 meters of
          adjacent skylights - provide a suitable strength cover e.g.; wire
          mesh, metal or ply sheet coverings depending on the size of
          the skylight.
WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                            Page 72

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.