Where respiratory equipment or safety harnesses and belts Site Manager / All
are to be used on site, evidence that the workers have been personnel
instructed in the equipment’s safe use, inspection, cleaning,
maintenance and storage will be provided prior to work in
relation to the equipment commences.
Signage specifying the mandatory wearing of personal Hutchinson Builders
protective equipment will be erected.
Hutchinson supervisory personnel will monitor personal HSO / Foreman
protective equipment use as detailed in subcontractor’s
health and safety documentation (Safety Plans/ Safe Work
Method Statements) and the compliance of others working in
areas where they may be exposed to hazards created by the
subcontractor.
The site PPE requirements will be communicated to all persons Site Manager / HSO/
prior to starting work on site and on site at the induction. Foreman
C 4 E18 5 Consultation will be undertaken with the client with the WH&S Act Site Management
Working at a Exposure to hazards
☐ Client’s specific to the client
objective of identifying specific hazards and issues relating to
2011 Part 2
VIC OHS Act
the project which the client is aware of.
Workplace site (list specific 2004 Part 3
5 The hazards / issues identified by the client will be addressed Site Management
hazards and risk
as follows:
assessment for
-
each)
-
Exposure to noise -
5 The specific site requirements of the client (e.g. inductions, Site Management /
Exposure to dust
site rules, emergency procedures, personal protective All personnel
Falling Objects equipment) will be identified, communicated to all personnel
and complied with (as applicable).
Exposure to
5 Weekly Project Coordination Meetings will be held with the Site Management
machinery hazards
client, workplace health and safety will be an agenda item at
Exposure to flying these meetings. Minutes of Weekly Project Coordination
objects Meetings will be kept.
5 The following public protection controls (as per the Public Site Management
Protection section of this Project Risk Assessment) will apply
as follows:
-
-
-
5 The following noise controls (as per the Noise section of this Site Management
Project Risk Assessment) will apply as follows:
-
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 74
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.