Original PDF page 158, section 1. The text section number identifies this passage in the reader.

                                                                  Where respiratory equipment or safety harnesses and belts                            Site Manager / All
                                                                  are to be used on site, evidence that the workers have been                          personnel
                                                                  instructed in the equipment’s safe use, inspection, cleaning,
                                                                  maintenance and storage will be provided prior to work in
                                                                  relation to the equipment commences.
                                                                  Signage specifying the mandatory wearing of personal                                 Hutchinson Builders
                                                                  protective equipment will be erected.
                                                                  Hutchinson supervisory personnel will monitor personal                               HSO / Foreman
                                                                  protective equipment use as detailed in subcontractor’s
                                                                  health and safety documentation (Safety Plans/ Safe Work
                                                                  Method Statements) and the compliance of others working in
                                                                  areas where they may be exposed to hazards created by the
                                                                  subcontractor.
                                                                  The site PPE requirements will be communicated to all persons                        Site Manager / HSO/
                                                                  prior to starting work on site and on site at the induction.                         Foreman


                                              C   4    E18    5   Consultation will be undertaken with the client with the              WH&S Act      Site Management
    Working at a    Exposure to hazards
☐   Client’s         specific to the client
                                                                  objective of identifying specific hazards and issues relating to
                                                                                                                                     
                                                                                                                                         2011 Part 2
                                                                                                                                         VIC OHS Act
                                                                  the project which the client is aware of.
    Workplace        site (list specific                                                                                                 2004 Part 3
                                                              5   The hazards / issues identified by the client will be addressed                      Site Management
                     hazards and risk
                                                                  as follows:
                     assessment for
                                                                       -
                     each)
                                                                       -
                    Exposure to noise                                 -
                                                              5   The specific site requirements of the client (e.g. inductions,                       Site Management /
                    Exposure to dust
                                                                  site rules, emergency procedures, personal protective                                All personnel
                    Falling Objects                              equipment) will be identified, communicated to all personnel
                                                                  and complied with (as applicable).
                    Exposure to
                                                              5   Weekly Project Coordination Meetings will be held with the                           Site Management
                     machinery hazards
                                                                  client, workplace health and safety will be an agenda item at
                    Exposure to flying                           these meetings. Minutes of Weekly Project Coordination
                     objects                                      Meetings will be kept.
                                                              5   The following public protection controls (as per the Public                          Site Management
                                                                  Protection section of this Project Risk Assessment) will apply
                                                                  as follows:
                                                                       -
                                                                       -
                                                                       -
                                                              5   The following noise controls (as per the Noise section of this                       Site Management
                                                                  Project Risk Assessment) will apply as follows:
                                                                       -
                                                      WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                       Page 74

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.