Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 159, section 1. The text section number identifies this passage in the reader.
-
-
5 The client’s requirements for public protection will be met Site Management
including as follows:
-
-
-
5 Public areas will be kept clear of any debris, trip or slip hazards Site manager or
and protected from any projectiles, dust etc. that may be foreman / All
released as a product of work undertaken. personnel
5 Work will be conducted outside of the normal business hours Site Management
of the client.
5 “Construction Site – No Unauthorised Entry” signs will be used Site manager or
to clearly identify areas on and around the perimeter of sites Foreman
as being a place of work.
OTHER….
☐
OTHER….
☐
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 75
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.