Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
2.3 Responsibilities of All Personnel Including Sub Contractors (PP:03)
All personnel performing works on this project are required to conform and comply in all respects with the
relevant Health and Safety Legislation, site direction and conditions of the signed subcontractor agreement.
They will also be required to fulfil the following minimum requirements as a condition of performing work
on this project:
a) To comply with all instructions issued by HB in relation to Health and Safety requirements.
b) Maintain the correct protective clothing and equipment for their works on this project.
c) Ensure that adequate training is completed for the work being performed, and work is performed
in accordance with the corresponding Safe Work Methods Statements / Job Hazard Analysis sheets
and ensure correct use of protective clothing and equipment.
d) Ensure plant and equipment meet all the requirements outlined in this document.
e) Report all incidents to HB Site Management immediately after the occurrence. At which point HB
shall pass this information to the client representative immediately after being made aware of the
incident. A high level of reporting is expected throughout the duration of this project.
f) HB site specific inductions will need to be completed prior to starting work on the project.
g) HB sub-contractors are to provide one worker on request for participation in the site health and
safety committee as required.
h) Ensure a Health and Safety Site Manager is employed on site in accordance with Work Health and
Safety requirements.
i) HB contractors are to help ensure that all workers comply with the relevant Health and Safety
Legislation.
j) Sub-contractors must submit Safe Work Method Statements (SWMS) in accordance with the
relevant states Health and Safety Legislation to HB for approval prior to work on site and include
information as detailed below:
Provide a list and evidence of all workers with certificates of competency relevant to their
proposed works issued under the relevant Health and Safety Act.
Scope of work, SWMS and commencement date of works.
Staff responsibility statements in implementing safe work practices.
Nomination of a supervisor to oversee all works on site.
A register of all hazardous substances and dangerous goods, with accompanying copies
of all SDS and safe work procedures.
Details of all tasks requiring, the use of personal protective equipment as a control and
the specific personal protective equipment to be used.
Workers required to use fall arrest/restraint equipment are to be instructed in safe work
at heights requirements and in the safe use of fall equipment. They are to provide
evidence of instruction at the site induction.
Evidence of competency for high risk work, including the operation of excavators and
other earthmoving equipment.
k) HB sub-contractors must attend the daily pre-start meetings in their respective work area.
All personnel are required to meet all HB health and safety standards, and operate within the parameters set
by this Work Health & Safety Management Plan (WHSMP). A copy of the WHSMP is held on site and available
for perusal upon request.
Persons who do not strictly comply with all the requirements of the state’s relevant Health and Safety
Legislation, HB' WHSMP and client standards will be removed immediately from the site and will not be
Page 16 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.