Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
allowed on site until such time as they comply in all respects with the statutory requirements. HB are
responsible for all of sub-contractors on this project. However all sub-contractors are PCBU’s in their own
right and cannot delegate or divorce from the PCBU’s obligations.
The safety management team shall review each subcontractor’s SWMS or Safety Plan where high risk work
activities are undertaken and record their review on the Safe Work Method Statement – Checklist prior to
that subcontractor commencing work (Additional information relating to the management of subcontractors
on HB sites can be located in PP:03 Subcontractor Management and Subcontractor SWMS Checklist - HB-
HSEQ-F-021-A).
Page 17 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.