24647 - 71 SEAVIEW TCE SUNSHINE BEACH WHS Management Plan – Appendix 1 – Project Risk Assessment


                                                      5   All work at heights to be completed using         Site Manager
                                                          appropriate controls. Work at Height Permit       HSE Advisor
                                                          to be issued for all work at heights              Subcontractor

                                                      3   Hole surrounds and hole covers are to be used     Site Manager
                                                          for all open holes. Where required using          HSE Advisor
                                                          suitable bunting and visual barricading is also   Subcontractor
                                                          to be implemented.
                                                      4   Suitable communication method to be               Site Manager
                                                          implemented between offsiders and                 HSE Advisor
                                                          operator. Exclusion zone to be established        Subcontractor
                                                          around spin off area to prevent workers being
                                                          struck with flying spoil (clay, rock etc.)
                                                      5   When installing cages all lifting equipment to    Site Manager
                                                          be attached and lifted correctly. All lifting     HSE Advisor
                                                          equipment to be tested tagged and listed on       Subcontractor
                                                          lifting register.
                                                      5   Ensure rig crews have a spill kit in close        Site Manager
                                                          proximity to the rig and are trained in spill     HSE Advisor
                                                          clean-up                                          Subcontractor

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.