SWMS:04 – MANUAL TASKS
H Controls / Work Methods Responsible Residual Risk
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer person/s for
L C R
C 5. Admin 6. PPE Monitor & Review
Setting up/preparing for Inappropriate planning for A 3 E 5 Assess the manual handling task to determine the most D 3 M
a manual handling task manual handling task 20 suitable method to perform the activity. 9
1 On site mechanical lifting equipment is to be used
where possible (e.g. trucks, cranes, trolleys, Duct lifters Site foreman
etc). supervising the task
5 A risk assessment is to be completed to determine any Workers involved
high-risk manual tasks being undertaken. with the task
5 Where personnel are unsure of a particular method of
lifting/handling or a task is considered potentially
hazardous, they are to report the issue to the Site
Foreman to discuss possible alternate controls.
The weight of components are to be assessed by
1 workers prior to lifting/handling and under no
circumstances should a load that a worker feels is
above their capacity, be attempted to be lifted –
consult Risk Assessment on page 7.
Conduct risk assessment and determine the most
suitable lifting technique. Assess distances to be
2
travelled, lifting and mechanical aids that may are
available etc.
1-2 Arrange assistance where determined by the risk
assessment such as personnel or equipment, ensure it
is organised before attempting the handling task.
1 No team lifting to be undertaken other than where it is
not practicable to use mechanical lifting aid(s).
Excessive, bulky loads A 3 E 2 On site mechanical lifting equipment is to be used Site foreman D 3 M
20 where possible (e.g. trucks, cranes, trolleys, vehicles supervising the task 9
etc).
1 Workers involved
with the task
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 32
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.