                                                                                    SWMS:04 – MANUAL TASKS
                                                                         H                     Controls / Work Methods                             Responsible          Residual Risk
       Job Steps                Potential Hazards        L    C     R    O             1. Eliminate 2. Substitute 3. Isolate 4. Engineer           person/s for
                                                                                                                                                                         L    C        R
                                                                         C                              5. Admin 6. PPE                          Monitor & Review
Setting up/preparing for    Inappropriate planning for   A    3     E    5        Assess the manual handling task to determine the most                                D     3        M
a manual handling task      manual handling task                   20              suitable method to perform the activity.                                                            9
                                                                         1        On site mechanical lifting equipment is to be used
                                                                                   where possible (e.g. trucks, cranes, trolleys, Duct lifters   Site foreman
                                                                                   etc).                                                         supervising the task

                                                                         5        A risk assessment is to be completed to determine any         Workers involved
                                                                                   high-risk manual tasks being undertaken.                      with the task
                                                                         5        Where personnel are unsure of a particular method of
                                                                                   lifting/handling or a task is considered potentially
                                                                                   hazardous, they are to report the issue to the Site
                                                                                   Foreman to discuss possible alternate controls.
                                                                                  The weight of components are to be assessed by
                                                                         1         workers prior to lifting/handling and under no
                                                                                   circumstances should a load that a worker feels is
                                                                                   above their capacity, be attempted to be lifted –
                                                                                   consult Risk Assessment on page 7.
                                                                                  Conduct risk assessment and determine the most
                                                                                   suitable lifting technique. Assess distances to be
                                                                         2
                                                                                   travelled, lifting and mechanical aids that may are
                                                                                   available etc.
                                                                        1-2       Arrange assistance where determined by the risk
                                                                                   assessment such as personnel or equipment, ensure it
                                                                                   is organised before attempting the handling task.
                                                                         1        No team lifting to be undertaken other than where it is
                                                                                   not practicable to use mechanical lifting aid(s).
                            Excessive, bulky loads       A    3     E    2        On site mechanical lifting equipment is to be used            Site foreman           D     3        M
                                                                   20              where possible (e.g. trucks, cranes, trolleys, vehicles       supervising the task                  9
                                                                                   etc).
                                                                         1                                                                       Workers involved
                                                                                                                                                 with the task


584 Milton Road TOOWONG QLD 4066                         SWMS Developed by:   Jamie Gilbert                                                               VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                      Position:            National Health & Safety Co-ordinator                                                          Page 32
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.