SWMS: 06 – Housekeeping
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
Provision of waste skips / bins Inadequate waste and/or A 3 E 5 Adequate number of waste skips / bins to be Hutchinson Builders B 3 H
and material storage facilities on material storage facilities 20 provided on site, commensurate with the size of the 17
site site and likely amount of waste to be generated on
a daily basis.
Suitable material storage facilities/ (i.e. storage
5
containers, designated storage area(s) etc.) to be
provided on site.
Storing / stacking materials on Trips, slips & falls A 3 E 5 Machinery, plant and vehicles used by Hutchinson Plant Operators / B 3 H
site 20 Builders personnel are to be parked or placed in areas Workers 17
on the site that do not restrict access or create a
hazard for pedestrians or other vehicles.
All materials are to be stacked/stored in designated
areas so as to enable clear access and reduce manual
5
handling risks.
Where unavoidable, materials requiring temporary
storage in a public access area are to be suitably
3 barricaded (minimum 900mm high) such that
members of the public are not exposed to any
hazard(s).
Falling objects C 3 H 5 Materials are to be stored such that a falling object Workers D 4 M
13 hazard is not created. This includes stacking 9
materials appropriately, giving consideration to the
size, weight and shape etc of the material(s), and
stacking up to shoulder height only where
practicable.
Materials are to be adequately secured to prevent
5
inadvertent movement.
584 Milton Road TOOWONG QLD 4066 SWMS Approved by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 47
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.