                                                                                              SWMS: 06 – Housekeeping
Safe Work Methods
                                                                                     H                    Controls / Work Methods                        Responsible            Residual
           Job Steps                      Potential Hazards          L    C     R    O            1. Eliminate 2. Substitute 3. Isolate 4. Engineer      person/s for             Risk
                                                                                     C                             5. Admin 6. PPE                     Monitor & Review       L    C R
                                      Walking into stored or         B     3   H      3       Materials with sharp ends that are stored in            Hutchinson Builders    D    4       M
                                      placed materials with sharp              13              designated areas where workers are to have access       Foreman                             9
                                      or protruding edges                                      are to have the ends protected and be identified
                                                                                               with spray paint or barricaded where practical.
                                                                                              Materials with sharp ends placed in work areas are
                                                                                                                                                       Workers
                                                                                               to be progressively used in the construction process
                                                                                               are identified by – fluro paint sprayed onto the ends
                                                                                               concerned to identify the pending hazard to
                                                                                               workers in the vicinity.
                                                                                              WORKERS ARE TO BE AWARE OF MATERIALS WHEN
                                                                                               REQUIRED TO WORK OR WALK NEAR STORAGE OR
                                                                                               PLACED MATERIASL IN STORAGE AND WORK
                                                                                               AREAS.
                                                                                              Notify the site foreman if materials have not been
                                                                                               properly managed as soon as the hazard is found or
                                                                                               identified.
Clean-up of work area(s)              Trips, slips & falls           A     3    E     5       Regular clean ups of all work areas controlled by       Workers                B    3       H
                                                                               20              Hutchinson Builders are to be undertaken.                                                   17
                                                                                              Rubbish is not to be allowed to accumulate so as to
                                                                                               create a tripping hazard on site.
                                                                                      5
                                                                                              Spills are to be cleaned up immediately.
                                                                                      5


Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel:
Workers:                                       Follow the procedure and report any hazards
Hutchinson Builders Foreman:                   Ensure adequate number of bins on site and monitor this SWMS requirements on site using the Task Observation
Form
584 Milton Road TOOWONG QLD 4066                             SWMS Approved by:    Jamie Gilbert                                                               VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                          Position: National Health & Safety Co-ordinator                                                                     Page 48
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.