Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
4. EMERGENCY RESPONSE (MP:09)
HB have developed a comprehensive Emergency Response Procedure (ERP) currently incorporated into every
employee induction. Procedures cover the response process in the event of environmental (fire, flood,
cyclone), chemical (explosion, spills) Plant/Equipment (fire, collision) and worker related emergency
(medical, rescue from high risk work).
Precautions have been taken to reduce risk however in the event of emergency HB Emergency Response
Procedure advises all employees to handle themselves and the situation in a calm controlled manner
reinforcing personal safety and the safety and wellbeing of others as priority. All procedures instruct the
immediate contact of emergency services on ‘000’.
Each site maintains a current copy of the ERP (located in Appendix 8 of this WHSMP) with site specific
evacuation plans displayed, and emergency response equipment available in the event of any of the above
mentioned emergencies.
Page 23 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.