Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 256, section 1. The text section number identifies this passage in the reader.
Hot Work Permit
HB-HSEQ-F-076
Version: 3
Permit No.
Section 1 – General Details
Subcontractor:
Project & Address:
Work Activity Description:
Location of work:
Special access restrictions
(due to the task involving a specific welding type
or the location being a hazardous area etc.):
Flame (welding, soldering, Spark or slag (grinding, cutting,
brazing, etc.) friction tools, welding, etc.)
Likely ignition source type(s):
Hot Object (metal surface,
plate, etc.) Other:
Section 2 – General Hot Work / Ignition Controls
Identify those Yes NA Control
general hot Fire extinguishers are to be located immediately adjacent to the hot work area and within 10m
work and Catch mats or boards are to be positioned over flooring, grates, grid-mesh to catch small sparks or slag
ignition
Combustible and flammable materials or fuel sources are required to be cleared from the area
controls
(consider a 15m area around the hot work where practicable and include surfaces above & below the work
required to be area)
undertaken as Drains, cable racks, electrical cables and other heat/fire sensitive items are to be covered
part of the hot (consider a 15m area and use fireproof blankets, catch boards and approved covers as applicable)
work: A water hose is to be run to the job location and primed ready for use
(identify as yes (where appropriate for work locations outdoors and in areas clear of electrical equipment)
or not A Fire Watcher is required to watch the area during and/or post work to monitor fire risk, sparks, slag, hot
applicable) objects
(consider for work: outdoors, in windy conditions, in hazardous areas, in confined spaces, in vessels)
During Work, and
Post Work for a time period of minutes
Section 3 – Specific Hot Work / Ignition Controls
Requirement If Yes, Include Additional Control Details to be
Yes NA Used:
The hot work is to be undertaken on or adjacent to plant that will
require an isolation (such as services, pipes, tanks, pressure vessels)
A fixed fire protection or detection system will need to be isolated
prior to work (note: isolations of long duration may also require
insurance entities to be notified)
The work area will require specific cleaning, purging, ventilating or
pre-work atmospheric monitoring (due to flammable/explosive
vapours, dusts, liquids or solid residues in the work area / location)
The work area will require pre-work cleaning, stripping, surface
preparation, or atmospheric monitoring during works (as a result of
surfaces / coatings that may create harmful emissions when cut or
heated)
The nature of the work requires specific respiratory protection to be
worn
The nature of the work requires specific controls to be implemented
to protect gas hoses or other sensitive plant items involved in the
work
The hot work involves arc-welding whereby specific controls are
required to minimise the potential for electric shock due to the
location of work or work environment (due to the presence of water,
moisture or heat, where the ambient temperature is above 32oC or
where the welder is forced to perform welding in a cramped position
with physical contact with conductive parts)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.