Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 257, section 1. The text section number identifies this passage in the reader.
Hot Work Permit
HB-HSEQ-F-076
Version: 3
Section 4 – Additional Hot Work Controls within Confined Spaces NA (Section Not Applicable)
Requirement Yes NA
Locate equipment outside the space where practicable
(such as gas cylinders, hoses, etc unless involved with respiratory devices)
Where an extraction fan is used, the inlet is to be located as close as practicable to the contamination source
Contaminants are to be expelled from the confined space so that they cannot be recirculated and will not harm
other workers
As arc-welding activities are to be suspended for substantial periods, power sources will need to be de-
energised, electrodes removed from holders and holders placed so that accidental contact or arcing cannot
occur
As gas welding/cutting activities are to be suspended for substantial periods, torch and cylinder valves are to be
closed with the torch and hose connections removed from the space and depressurised
Permit Request:
This acknowledgement signifies a formal request to commence hot works. As the person requesting this permit, I hereby certify
that:
I am competent to coordinate this hot work in accordance with the Hot Work Permit details;
I shall undertake to implement all planned and necessary controls to ensure safe hot work methods; and
I shall monitor the hot work hazards and control methods throughout the hot work.
Name: Signature: Date: Time:
Hutchinson Builders Authorisation:
This Hutchinson Builders Authorisation signifies that the planning component of the Hot Work Permit has been completed and
that hot work is authorised to commence in accordance with the Permit Request.
Name: Signature: Date: Time:
Section 5 – Implementation
Hot Works Authorisation (Work Coordinator in Direct Control):
The procedures, control measures and precautions appropriate for the safe execution of hot work have been implemented and
the persons required to work have been advised of and understand the requirements of the Hot Work Permit.
Name: Signature: Date: Time:
Constraints: This Authorisation is valid until the following occurs, or the date and time shown:
Date: Time:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.