                                                                                            SWMS:13 – Starter Bars

Safe Work Methods
                                                                                      H                      Controls / Work Methods                         Responsible         Residual
             Job Steps                    Potential Hazards      L    C       R       O              1. Eliminate 2. Substitute 3. Isolate 4. Engineer   Person/s for Monitor      Risk
                                                                                      C                               5. Admin 6. PPE                         & Review          L C R
Working in the vicinity of starter    Impalement                 C    4        E       5        Starter bars that are cranked are to be used            Workers                D    3       M
bars                                                                          18                 where possible on site.                                                                     9
Working in the vicinity of starter                                                                                                                       Hutchinson Builders
                                                                                                To ensure that bars that are not cranked do not
bars (Cont)                                                                            5                                                                 Foreman
                                                                                                 pose a hazard to personnel in the vicinity, one or
                                                                                                 a combination of the following controls are to be
                                                                                                 implemented:
                                                                                       3               erecting barricades using mesh or equivalent
                                                                                                        to isolate an area between exposed bars and
                                                                                                        personnel on site,
                                                                                       4               protecting the ends of bars with purpose-
                                                                                                        made caps, and
                                                                                       4               Protecting ends of bars with timber or other
                                                                                                        suitable material.

                                                                                       5        Manufacturer’s instructions are to be followed
                                                                                                 when using proprietary systems to protect the
                                                                                                 ends of exposed starter bars.
                                                                                       4       Where workers are required to undertake work
                                                                                                activities above starter bars, a suitable means of
                                                                                                fall protection is to be provided (i.e. edge
                                                                                                protection).

                                                                                       5       Regular inspections of the work area are to be
                                                                                                undertaken to ensure all starter bars are suitably
                                                                                                protected.
                                      Slips / trips              C    3       H        3        Where practicable, erect barricades (minimum            Workers                D    3       M
                                                                              13                 900mm high) using mesh, barrier tape or                                                     9
                                                                                                 equivalent to isolate an area between exposed           Hutchinson Builders
                                                                                                 bars and unauthorised personnel on site.                Foreman

584 Milton Road TOOWONG QLD 4066                         SWMS Developed by:        Jamie Gilbert                                                                VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                      Position:                 National Health & Safety Co-ordinator                                                          Page 109
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.