Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 272, section 1. The text section number identifies this passage in the reader.
SWMS:13 – Starter Bars
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Monitor Risk
C 5. Admin 6. PPE & Review L C R
Regular inspections of the work area are to be
5 undertaken to ensure all starter bars are suitably
protected.
Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel: Workers: Follow the procedure and report any inconsistencies
Hutchinson Builders Foreman: Ensure compliance and monitor SWMS requirements on site using the Observation log
Developed & approved on site by:
Name: Position: Date:
Matt Leeke / Terry Strahan / Jesse Joyce Site Manager/ Foreman
Workers Representative
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 110
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.