Working at Heights Permit
HB-HSEQ-F-077
Version: 5
Permit No.
Section 1 – General Details
Subcontractor:
Project:
Work Activity Description:
Location of work:
Falling objects Manual handling of loads
Ungraded Edges Risk of falling person
High Winds Overhead electric cables
Likely hazards associated with this work Lack of space Unsecure ladders
Uneven floor surfaces Fragile roofs
Other
Selection of Work Station – Hierarchy of Can this task be completed from;
Control. 1. From the ground? Preferred YES / NO - Permit
2. From scaffold? YES / NO
Selection of the first (1 to 5) available work at 3. From Mobile Scaffold? YES / NO
height processes will increase control 4. From a Scissor Lift/EWP YES / NO
effectiveness. Circle One 5. From a Ladder/Platform Ladder? Least Preferred YES / NO
Section 2 – Fall Restraint & Fall arrest
Requirement Yes No
If No, Additional Control measures must be put in place or
work activities must be terminated.
Has a safe work method statement been developed for the work activity
Do all persons involved in the working at heights process undergone working at heights
training
Has fall protection equipment been inspected by a competent person prior to use. Has
the equipment been tested and tagged and in date
All personnel involved in working at heights must be involved in the rescue plan
process. Refer to SWMS
All anchorage points have been accessed by competent person
Section 3 – Working off EWP
Requirement If No, Additional Control measures must be put in place or
Yes No work activities must be terminated.
Has all pre-operational checks been carried out and recorded in the machinery log book
prior to use
Has a work method statement been developed for the work activity
Working off an EWP 11+ meters, the operator of plant holds a licence to operate a
boom-type elevating work platform
Has fall protection equipment been inspected by a competent person prior to use. Has
the equipment been tested and tagged and in date
Are harnesses correctly fitted to all personnel and attached to the manufacturer’s
anchor point in the elevated work platform.
The work area will require specific cleaning to ensure ground conditions are stable
(e.g.; firm, level & safe) to extend and travel the EWP. Have these conditions been
assessed by the operator
Elevating work platforms must never by overloaded due to structural failure or tipping
of plant. Have loads been assessed by operator
Section 4 – Working off Mobile Scaffolds
Requirement If No, Additional Control measures must be put in place or
Yes No work activities must be terminated
If yes you are required to be instructed in the
Will you be required to erect or dismantle a mobile scaffold less than 4 meters in
manufacturers erection and dismantling
height?
requirements
Have you checked physical defects before every use, including the access ladder, braces
and decks, (Refer to the manufacturer’s directions if available)
Have you checked the safe working load of the scaffold before including tools and any
other equipment to the scaffold? Keep scaffold loads to a minimum.
Are all casters locked or chocked against any possible movement before any work is
preformed from the scaffold.
Page 1 of 294
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.