Working at Heights Permit
HB-HSEQ-F-077
Version: 5
Are guardrails
Section 5 –and
6 toe boardsoff
Working in place on all open
Trestles
portable and sides
step of the
Planks
and scaffold ladders
platform
The work area will require specific cleaning to ensure ground conditions are stable
Requirement If No, Additional Control measures must be put in place
(e.g.; firm, level & safe) Ensure mobile scaffold is not located closer than 2 meter to any Yes No or work activities must be terminated
slab edge, penetration
Are trestles and planks or other condition
in good step down,and
unless a fixed
are free fence,
from railororbroken
cracks suitablyparts
high–
Is the ladder
upturn islock in good condition and treads secure and not cracked or broken
in place.
braces, pins etc
Has ayou
Planks
Will work
are method
beonly
conductingstatement
to span light
to take been
works developed
the when
applied load for
working the
– off work
provide
the activity
ladder?
diagram If of
Nosetreturn
up distances
to section
between
3 or 4 on trestles
this permit.
required for intended weight
Will you be able to have and maintain three points of contact at all times working off If No a Platform ladder must be used
Where a ladder access is to be provided it shall be 900mm above platform height
the ladder?
Is the base of the ladder
trestlesmounted
mountedon
ongood
goodand
andstable
stableground
ground
If Yes
yes an
return
internal
to section
and external
3 or 4 on
hand
thisrails
permit.
are to
Will your job task require you to work above 2 meters
be fitted
If required
Has fall hazards
to usebeen
as aaccess
n access
fortoworking
a work under
platform
2 meters
– to be–extended
keeping area
900mm
clearabove
of objects If No install a hand rails system on trestles
by 1.5 meters from trestles
landing
Can awork
Has workbemethod
completed without
statement overdeveloped
been reaching and or standing
for the or kneeling on the top
work activity If No return to section 3 or 4 on this permit
step of platform
Has a work method statement been developed for the work activity
Permit Request:
This acknowledgement signifies a formal request to commence Working at Heights. As the person requesting this permit, I hereby certify that the risk of falls
have been considered as per the hierarchy for controls:
I am competent to coordinate Working at Heights in accordance with the Working at Heights Permit details;
I shall undertake to implement all planned and necessary controls to ensure safe Working at Heights methods; and
I shall monitor Working at Heights hazards and control methods throughout the Work at Heights.
Name: Signature: Date: Time:
Hutchinson Builders Authorisation:
This Hutchinson Builders Authorisation signifies that the planning component of the Working at Heights Permit has been completed and that the Work at
Heights is authorised to commence in accordance with the Permit Request.
Name: Signature: Date: Time:
Section 7 – Implementation
Working at Heights Authorisation (Work Coordinator in Direct Control):
The procedures, control measures and precautions appropriate for the safe execution of Working at Heights has been implemented and the persons
required to work have been advised of and understand of the requirements of the Work at Heights Permit.
Name: Signature: Date: Time:
Constraints: This Authorisation is valid until the following occurs, or the date and time shown:
Date: Time:
Page 2 of 294
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.